Bridge (ID- 1183 ) Inventory Report

Kakdaghad bridge On Chainage 34.697 of Rudarprayag Gorikund National Highway

Data finalized On 02 Feb 2024

By Er. Pushkar Pal Singh Bisht

Last Rated On 08 Jul 2024

Rating 1.19%

Categorized As

XXXXX on XX-XX-XXXX

In District : Rudraprayag Under Division : NH Rudraprayag

General

Bridge Type : Motor Bridge High Level
Structure No : 23
Feature Intersected : Local gadera
Name of Bridge : Kakdaghad bridge
Nearest Town : kakdagad
Latitude (Northing) : 30.49015700
Longitude (Easting) : 79.08509800
Construction Year : 2010
Inventory Year : 2024

Geometric

Overall length (in meter) : 46.70
Total No of Span : 1
Maximuam Span (in meter) : 46.70
Span Arragment : 1*46.70
No of Lane : 2.000
Overall Width (m) : 11.900
Carriageway Width (m) : 7.600
RS Footpath Width (m) : 1.700
LS Footpath Width (m) : 1.700
Approch Width i/c Shoulders (m) : 11.500
Gradient (%age) : 0
Skew Angle (degree) : 0.00
Radius of Curve in Plan (if Any) : 0.00

Design Data

HFL Highest Flood Level :
OFL Ordinary Flood Level :
LWL Low Water Level :
Design Velocity (m/Sec) :
Design Discharge (Cumecs) :
Soffit Level at Centre :
Road Level at Centre :
Design Scour Level at Pier :
Design Scour Level at Abutments :
Exposure Condition : Moderate
Seismic Importance factor : 0.0
Design Loading : Class A
Load Rating : Class A

Super-Structure

Superstructure Type : T-beam and slab
Superstructure Material : Reinforced concrete
Wearing Coat Type : Bituminous Concrete
Expension Joint Type : Single Strip/Box Seal Joint
Railing/Crash Barrier type : Tubular steel
Bearing type : POT PIN

Sub-Structure

Founding Strata : Rocky
Abutment Foundation Type : Raft
Pier Foundation Type : NA
No of Piers : 0
Abutment Type : RCC buttressed type
Pier Type : NA

Protection Work

Bank Protection Left Side of Up-stream : no protection work provided
Bank Protection Right Side of Up-stream : no protection work provided
Bank Protection Left Side of Down-stream : no protection work provided
Bank Protection Right Side of Down-stream : no protection work provided
Floor Protection on Up-stream : no protection work provided
Floor Protection on Down-stream : no protection work provided
Tratment for Corrosion Protection (if any) : no special treatment provided