Bridge (ID- 1212 ) Inventory Report

Devangana Bridge On Chainage 42.930 of Rudarprayag Gorikund National Highway

Data finalized On 02 Feb 2024

By Er S. P. Tiwari

Last Rated On 18 Nov 2023

Rating 0.00%

Categorized As

XXXXX on XX-XX-XXXX

In District : Rudraprayag Under Division : NH Rudraprayag

General

Bridge Type : Motor Bridge High Level
Structure No : 29
Feature Intersected : Ghuttu Gaad
Name of Bridge : Devangana Bridge
Nearest Town : Guptkashi
Latitude (Northing) : 30.51097222
Longitude (Easting) : 79.05444444
Construction Year : 2023
Inventory Year : 2024

Geometric

Overall length (in meter) : 30.00
Total No of Span : 1
Maximuam Span (in meter) : 30.00
Span Arragment : 1*30
No of Lane : 2.000
Overall Width (m) : 11.900
Carriageway Width (m) : 8.900
RS Footpath Width (m) : 1.000
LS Footpath Width (m) : 1.000
Approch Width i/c Shoulders (m) : 11.900
Gradient (%age) : 0
Skew Angle (degree) : 0.00
Radius of Curve in Plan (if Any) : 0.00

Design Data

HFL Highest Flood Level :
OFL Ordinary Flood Level :
LWL Low Water Level :
Design Velocity (m/Sec) :
Design Discharge (Cumecs) :
Soffit Level at Centre :
Road Level at Centre :
Design Scour Level at Pier :
Design Scour Level at Abutments :
Exposure Condition : Moderate
Seismic Importance factor : 0.0
Design Loading : Class A
Load Rating : Class A

Super-Structure

Superstructure Type : T-beam and slab
Superstructure Material : Reinforced concrete
Wearing Coat Type : Cement Concrete
Expension Joint Type : Single Strip/Box Seal Joint
Railing/Crash Barrier type : Cast-in-situ concrete
Bearing type : POT PIN

Sub-Structure

Founding Strata : Sandy
Abutment Foundation Type : Raft
Pier Foundation Type : NA
No of Piers : 0
Abutment Type : RCC Box type
Pier Type : NA

Protection Work

Bank Protection Left Side of Up-stream : no protection work provided
Bank Protection Right Side of Up-stream : no protection work provided
Bank Protection Left Side of Down-stream : no protection work provided
Bank Protection Right Side of Down-stream : no protection work provided
Floor Protection on Up-stream : no protection work provided
Floor Protection on Down-stream : no protection work provided
Tratment for Corrosion Protection (if any) : no special treatment provided