Bridge (ID- 1215 ) Inventory Report

Mehelchori Bridge On Chainage 175.380 of Jyolikot Almora Karanprayag national highway

Data finalized On 13 Feb 2024

By Er. Ashutosh Sharma

Last Rated On 19 Nov 2023

Rating 3.29%

Categorized As

XXXXX on XX-XX-XXXX

In District : Chamoli Under Division : NH Rudraprayag

General

Bridge Type : Motor Bridge High Level
Structure No : 30
Feature Intersected : Ram Ganga River
Name of Bridge : Mehelchori Bridge
Nearest Town : Gairsain
Latitude (Northing) : 29.98272000
Longitude (Easting) : 79.32479200
Construction Year : 2000
Inventory Year : 2024

Geometric

Overall length (in meter) : 44.00
Total No of Span : 1
Maximuam Span (in meter) : 44.00
Span Arragment : 1*44
No of Lane : 1.000
Overall Width (m) : 5.000
Carriageway Width (m) : 4.000
RS Footpath Width (m) : 0.000
LS Footpath Width (m) : 0.000
Approch Width i/c Shoulders (m) : 5.000
Gradient (%age) : 0
Skew Angle (degree) : 0.00
Radius of Curve in Plan (if Any) : 0.00

Design Data

HFL Highest Flood Level :
OFL Ordinary Flood Level :
LWL Low Water Level :
Design Velocity (m/Sec) :
Design Discharge (Cumecs) :
Soffit Level at Centre :
Road Level at Centre :
Design Scour Level at Pier :
Design Scour Level at Abutments :
Exposure Condition : Moderate
Seismic Importance factor : 0.0
Design Loading : Class B
Load Rating : Class B

Super-Structure

Superstructure Type : Box girder
Superstructure Material : Composite
Wearing Coat Type : Mastic asphalt
Expension Joint Type : Single Strip/Box Seal Joint
Railing/Crash Barrier type : Tubular steel
Bearing type : POT PIN

Sub-Structure

Founding Strata : Rocky
Abutment Foundation Type : Open
Pier Foundation Type : NA
No of Piers : 0
Abutment Type : Stone Masonry
Pier Type : NA

Protection Work

Bank Protection Left Side of Up-stream : no protection work provided
Bank Protection Right Side of Up-stream : no protection work provided
Bank Protection Left Side of Down-stream : no protection work provided
Bank Protection Right Side of Down-stream : no protection work provided
Floor Protection on Up-stream : no protection work provided
Floor Protection on Down-stream : no protection work provided
Tratment for Corrosion Protection (if any) : no special treatment provided