Bridge (ID- 122 ) Inventory Report

Margaon Bridge On Chainage 1.275 of Road from Dharasu Bend to Margaon Chamiyari Dyuli Ulan motor road.

Data finalized On 19 Dec 2023

By surendramohan arya

Last Rated On 08 Nov 2023

Rating 0.00%

Categorized As

XXXXX on XX-XX-XXXX

In District : Uttarkashi Under Division : CD Uttarkashi

General

Bridge Type : Motor Bridge High Level
Structure No : 1/10 to 1/12
Feature Intersected : Bhagirathi River
Name of Bridge : Margaon Bridge
Nearest Town : Barethi
Latitude (Northing) : 30.63070550
Longitude (Easting) : 78.33200550
Construction Year : 2005
Inventory Year : 2020

Geometric

Overall length (in meter) : 58.29
Total No of Span : 1
Maximuam Span (in meter) : 58.29
Span Arragment : 1x58.288
No of Lane : 1.000
Overall Width (m) : 5.250
Carriageway Width (m) : 4.700
RS Footpath Width (m) : 0.000
LS Footpath Width (m) : 0.000
Approch Width i/c Shoulders (m) : 6.000
Gradient (%age) : 0
Skew Angle (degree) : 0.00
Radius of Curve in Plan (if Any) : 0.00

Design Data

HFL Highest Flood Level :
OFL Ordinary Flood Level :
LWL Low Water Level :
Design Velocity (m/Sec) :
Design Discharge (Cumecs) :
Soffit Level at Centre :
Road Level at Centre :
Design Scour Level at Pier :
Design Scour Level at Abutments :
Exposure Condition : Moderate
Seismic Importance factor : 1.0
Design Loading : Class A
Load Rating : Class A

Super-Structure

Superstructure Type : Truss
Superstructure Material : Steel
Wearing Coat Type : Cement Concrete
Expension Joint Type : Single Strip/Box Seal Joint
Railing/Crash Barrier type : Steel rolled section
Bearing type : Elastomeric

Sub-Structure

Founding Strata : Rocky
Abutment Foundation Type : Open
Pier Foundation Type : NA
No of Piers : 0
Abutment Type : Stone Masonry
Pier Type : NA

Protection Work

Bank Protection Left Side of Up-stream : no protection work provided
Bank Protection Right Side of Up-stream : no protection work provided
Bank Protection Left Side of Down-stream : no protection work provided
Bank Protection Right Side of Down-stream : no protection work provided
Floor Protection on Up-stream : no protection work provided
Floor Protection on Down-stream : no protection work provided
Tratment for Corrosion Protection (if any) : no special treatment provided