Bridge (ID- 1251 ) Inventory Report

Gairwaram-dharwaram bridge On Chainage 6.300 of Kulsari Dharwaram Gairwaram Bajwad Aalkot motor road (ODR)

Data finalized On 04 Jan 2024

By Ravindra Bisht

Last Rated On 14 Jun 2024

Rating 0.52%

Categorized As

XXXXX on XX-XX-XXXX

In District : Chamoli Under Division : CD Tharali

General

Bridge Type : Motor Bridge High Level
Structure No : 7/2
Feature Intersected : Local gadhera
Name of Bridge : Gairwaram-dharwaram bridge
Nearest Town : dharwaram
Latitude (Northing) : 30.07892450
Longitude (Easting) : 79.42842520
Construction Year : 2018
Inventory Year : 2021
Work Code(s) : --

Geometric

Overall length (in meter) : 48.00
Total No of Span : 1
Maximuam Span (in meter) : 48.00
Span Arragment : 1x48
No of Lane : 1.000
Overall Width (m) : 4.800
Carriageway Width (m) : 4.250
RS Footpath Width (m) : 0.000
LS Footpath Width (m) : 0.000
Approch Width i/c Shoulders (m) : 6.000
Gradient (%age) : 0
Skew Angle (degree) : 0.00
Radius of Curve in Plan (if Any) : 0.00

Design Data

HFL Highest Flood Level :
OFL Ordinary Flood Level :
LWL Low Water Level :
Design Velocity (m/Sec) :
Design Discharge (Cumecs) :
Soffit Level at Centre :
Road Level at Centre :
Design Scour Level at Pier :
Design Scour Level at Abutments :
Exposure Condition : Moderate
Seismic Importance factor : 0.0
Design Loading : Class B
Load Rating : Class B

Super-Structure

Superstructure Type : Truss
Superstructure Material : Steel
Wearing Coat Type : Cement Concrete
Expension Joint Type : Not Provided
Railing/Crash Barrier type : Pre-cast concrete
Bearing type : POT PIN

Sub-Structure

Founding Strata : Rocky
Abutment Foundation Type : Open
Pier Foundation Type : NA
No of Piers : 0
Abutment Type : Stone Masonry
Pier Type : NA

Protection Work

Bank Protection Left Side of Up-stream : Plum protection
Bank Protection Right Side of Up-stream : Plum protection
Bank Protection Left Side of Down-stream : Plum protection
Bank Protection Right Side of Down-stream : Plum protection
Floor Protection on Up-stream : no protection work provided
Floor Protection on Down-stream : no protection work provided
Tratment for Corrosion Protection (if any) : no special treatment provided