Bridge (ID- 1252 ) Inventory Report

R.C.C slab at Nagara On Chainage 2.000 of Agneri Thani gaon motor road

Data finalized On 16 Nov 2022

By Er. Vijaypal Singh

Last Rated On 16 Jun 2024

Rating 0.00%

Categorized As

XXXXX on XX-XX-XXXX

In District : Almora Under Division : CD Ranikhet

General

Bridge Type : Road Over Bridge
Structure No : 2/1
Feature Intersected : local nala
Name of Bridge : R.C.C slab at Nagara
Nearest Town : Nagara
Latitude (Northing) : 29.89925000
Longitude (Easting) : 79.33522222
Construction Year : 2020
Inventory Year : 2021

Geometric

Overall length (in meter) : 7.00
Total No of Span : 1
Maximuam Span (in meter) : 6.00
Span Arragment : 1x7
No of Lane : 1.000
Overall Width (m) : 7.500
Carriageway Width (m) : 6.850
RS Footpath Width (m) : 0.000
LS Footpath Width (m) : 0.000
Approch Width i/c Shoulders (m) : 6.850
Gradient (%age) : 0
Skew Angle (degree) : 0.00
Radius of Curve in Plan (if Any) : 0.00

Design Data

HFL Highest Flood Level : 953.000
OFL Ordinary Flood Level : 947.000
LWL Low Water Level : 946.000
Design Velocity (m/Sec) :
Design Discharge (Cumecs) :
Soffit Level at Centre :
Road Level at Centre :
Design Scour Level at Pier :
Design Scour Level at Abutments :
Exposure Condition : Moderate
Seismic Importance factor : 1.0
Design Loading : NA
Load Rating : NA

Super-Structure

Superstructure Type : Solid slab
Superstructure Material : Reinforced concrete
Wearing Coat Type : Not Provided
Expension Joint Type : Not Provided
Railing/Crash Barrier type : Cast-in-situ concrete
Bearing type : Not Provided

Sub-Structure

Founding Strata : Rocky
Abutment Foundation Type : Raft
Pier Foundation Type : NA
No of Piers : 0
Abutment Type : Stone Masonry
Pier Type : NA

Protection Work

Bank Protection Left Side of Up-stream : no protection work provided
Bank Protection Right Side of Up-stream : no protection work provided
Bank Protection Left Side of Down-stream : no protection work provided
Bank Protection Right Side of Down-stream : no protection work provided
Floor Protection on Up-stream : no protection work provided
Floor Protection on Down-stream : no protection work provided
Tratment for Corrosion Protection (if any) : no special treatment provided