Bridge (ID- 1255 ) Inventory Report

Bailey Bridge On Chainage 0.400 of From km 7 of Masi Aadigaon Jaurasi motor road to Shahid Mohan Ch. Sharma's village Timilgaon link road

Data finalized On 16 Nov 2022

By Er. Vijaypal Singh

Last Rated On 16 Jun 2024

Rating 0.00%

Categorized As

XXXXX on XX-XX-XXXX

In District : Almora Under Division : CD Ranikhet

General

Bridge Type : Road Over Bridge
Structure No : 1/1
Feature Intersected : bogard nala
Name of Bridge : Bailey Bridge
Nearest Town : Masi
Latitude (Northing) : 29.82433611
Longitude (Easting) : 79.27797778
Construction Year : 2016
Inventory Year : 2021

Geometric

Overall length (in meter) : 20.00
Total No of Span : 1
Maximuam Span (in meter) : 18.00
Span Arragment : 1x20
No of Lane : 1.000
Overall Width (m) : 4.500
Carriageway Width (m) : 4.250
RS Footpath Width (m) : 0.000
LS Footpath Width (m) : 0.000
Approch Width i/c Shoulders (m) : 6.800
Gradient (%age) : 0
Skew Angle (degree) : 0.00
Radius of Curve in Plan (if Any) : 0.00

Design Data

HFL Highest Flood Level : 855.000
OFL Ordinary Flood Level : 850.000
LWL Low Water Level : 849.000
Design Velocity (m/Sec) :
Design Discharge (Cumecs) :
Soffit Level at Centre :
Road Level at Centre :
Design Scour Level at Pier :
Design Scour Level at Abutments :
Exposure Condition : Moderate
Seismic Importance factor : 1.0
Design Loading : NA
Load Rating : NA

Super-Structure

Superstructure Type : Bailey
Superstructure Material : Steel
Wearing Coat Type : Not Provided
Expension Joint Type : Not Provided
Railing/Crash Barrier type : Steel rolled section
Bearing type : Not Provided

Sub-Structure

Founding Strata : Rocky
Abutment Foundation Type : Raft
Pier Foundation Type : NA
No of Piers : 0
Abutment Type : Stone Masonry
Pier Type : NA

Protection Work

Bank Protection Left Side of Up-stream : no protection work provided
Bank Protection Right Side of Up-stream : plum concrete
Bank Protection Left Side of Down-stream : no protection work provided
Bank Protection Right Side of Down-stream : no protection work provided
Floor Protection on Up-stream : no protection work provided
Floor Protection on Down-stream : no protection work provided
Tratment for Corrosion Protection (if any) : no special treatment provided