Bridge (ID- 1265 ) Inventory Report

Asnol gad Bridge On Chainage 216.363 of Rishikesh Dharasu Barkot Phool Chatti (Yamunotri) national highway

Data Yet Not Finalized

Last Rated On 28 Aug 2024

Rating 0.17%

Categorized As

XXXXX on XX-XX-XXXX

In District : Uttarkashi Under Division : NH Badkot

General

Bridge Type : Motor Bridge High Level
Structure No : 217/1
Feature Intersected : Asnol Gad
Name of Bridge : Asnol gad Bridge
Nearest Town : Foolchatii
Latitude (Northing) : 30.95750000
Longitude (Easting) : 78.42083000
Construction Year : 2017
Inventory Year : 2021

Geometric

Overall length (in meter) : 25.00
Total No of Span : 1
Maximuam Span (in meter) : 25.00
Span Arragment : 1x25M
No of Lane : 2.000
Overall Width (m) : 10.000
Carriageway Width (m) : 7.600
RS Footpath Width (m) : 0.750
LS Footpath Width (m) : 0.800
Approch Width i/c Shoulders (m) : 10.000
Gradient (%age) : 0
Skew Angle (degree) : 0.00
Radius of Curve in Plan (if Any) : 0.00

Design Data

HFL Highest Flood Level :
OFL Ordinary Flood Level :
LWL Low Water Level :
Design Velocity (m/Sec) :
Design Discharge (Cumecs) :
Soffit Level at Centre :
Road Level at Centre :
Design Scour Level at Pier :
Design Scour Level at Abutments :
Exposure Condition : Moderate
Seismic Importance factor : 1.0
Design Loading : Class A
Load Rating : Class A

Super-Structure

Superstructure Type : T-beam and slab
Superstructure Material : Reinforced concrete
Wearing Coat Type : Cement Concrete
Expension Joint Type : Single Strip/Box Seal Joint
Railing/Crash Barrier type : Cast-in-situ concrete
Bearing type : POT PIN

Sub-Structure

Founding Strata : Rocky
Abutment Foundation Type : Raft
Pier Foundation Type : NA
No of Piers : 0
Abutment Type : RCC Box type
Pier Type : NA

Protection Work

Bank Protection Left Side of Up-stream : Plum masonary work
Bank Protection Right Side of Up-stream : no protection work provided
Bank Protection Left Side of Down-stream : no protection work provided
Bank Protection Right Side of Down-stream : no protection work provided
Floor Protection on Up-stream : no protection work provided
Floor Protection on Down-stream : no protection work provided
Tratment for Corrosion Protection (if any) : no special treatment provided