Bridge (ID- 1292 ) Inventory Report

60 m Vidyapeeth Motor Bridge On Chainage 2.650 of Chunnibent Vidyapeeth Motor Road

Data finalized On 22 Nov 2023

By Pradeep Semwal

Last Rated On 10 Jun 2024

Rating 0.00%

Categorized As

XXXXX on XX-XX-XXXX

In District : Rudraprayag Under Division : CD Ukhimath

General

Bridge Type : Motor Bridge High Level
Structure No : 1
Feature Intersected : Mandakini River
Name of Bridge : 60 m Vidyapeeth Motor Bridge
Nearest Town : Ukhimath
Latitude (Northing) : 30.52805500
Longitude (Easting) : 79.09083330
Construction Year : 2012
Inventory Year : 2020

Geometric

Overall length (in meter) : 60.00
Total No of Span : 1
Maximuam Span (in meter) : 60.00
Span Arragment : 1x60
No of Lane : 1.000
Overall Width (m) : 6.000
Carriageway Width (m) : 4.250
RS Footpath Width (m) : 0.000
LS Footpath Width (m) : 0.000
Approch Width i/c Shoulders (m) : 6.000
Gradient (%age) : 0
Skew Angle (degree) : 0.00
Radius of Curve in Plan (if Any) : 0.00

Design Data

HFL Highest Flood Level : 1067.000
OFL Ordinary Flood Level : 1052.000
LWL Low Water Level : 1050.000
Design Velocity (m/Sec) :
Design Discharge (Cumecs) :
Soffit Level at Centre : 1067.000
Road Level at Centre : 1067.000
Design Scour Level at Pier :
Design Scour Level at Abutments :
Exposure Condition : Moderate
Seismic Importance factor : 0.0
Design Loading : Class B
Load Rating : Class B

Super-Structure

Superstructure Type : Truss
Superstructure Material : Steel
Wearing Coat Type : Cement Concrete
Expension Joint Type : Other
Railing/Crash Barrier type : Steel rolled section
Bearing type : Elastomeric

Sub-Structure

Founding Strata : Bouldery
Abutment Foundation Type : Open
Pier Foundation Type : NA
No of Piers : 0
Abutment Type : Stone Masonry
Pier Type : NA

Protection Work

Bank Protection Left Side of Up-stream : RCC Jacketting of Abutment
Bank Protection Right Side of Up-stream : Plum Concrete blocks
Bank Protection Left Side of Down-stream : RCC Jacketting of Abutment
Bank Protection Right Side of Down-stream : Plum Concrete blocks
Floor Protection on Up-stream : no protection work provided
Floor Protection on Down-stream : no protection work provided
Tratment for Corrosion Protection (if any) : no special treatment provided