Bridge (ID- 1293 ) Inventory Report

36 m Truss Bridge on Tala Barangali MR On Chainage 0.950 of Tala Barangali Motor Road

Data finalized On 22 Nov 2023

By Mukesh Painuly

Last Rated On 18 Jun 2024

Rating 1.56%

Categorized As

XXXXX on XX-XX-XXXX

In District : Rudraprayag Under Division : CD Ukhimath

General

Bridge Type : Motor Bridge High Level
Structure No : TB/1
Feature Intersected : Akashkamini
Name of Bridge : 36 m Truss Bridge on Tala Barangali MR
Nearest Town : Ukhimath
Latitude (Northing) : 30.50767000
Longitude (Easting) : 79.16283890
Construction Year : 2008
Inventory Year : 2020

Geometric

Overall length (in meter) : 36.00
Total No of Span : 1
Maximuam Span (in meter) : 36.00
Span Arragment : 1x36
No of Lane : 1.000
Overall Width (m) : 6.000
Carriageway Width (m) : 4.250
RS Footpath Width (m) : 0.000
LS Footpath Width (m) : 0.000
Approch Width i/c Shoulders (m) : 6.000
Gradient (%age) : 0
Skew Angle (degree) : 0.00
Radius of Curve in Plan (if Any) : 0.00

Design Data

HFL Highest Flood Level : 1816.000
OFL Ordinary Flood Level :
LWL Low Water Level : 1813.000
Design Velocity (m/Sec) :
Design Discharge (Cumecs) :
Soffit Level at Centre : 1828.000
Road Level at Centre : 1829.000
Design Scour Level at Pier :
Design Scour Level at Abutments :
Exposure Condition : Moderate
Seismic Importance factor : 0.0
Design Loading : Class B
Load Rating : Class B

Super-Structure

Superstructure Type : Truss
Superstructure Material : Steel
Wearing Coat Type : Cement Concrete
Expension Joint Type : Other
Railing/Crash Barrier type : Steel rolled section
Bearing type : Elastomeric

Sub-Structure

Founding Strata : Bouldery
Abutment Foundation Type : Open
Pier Foundation Type : NA
No of Piers : 0
Abutment Type : Stone Masonry
Pier Type : NA

Protection Work

Bank Protection Left Side of Up-stream : Plum Concrete blocks
Bank Protection Right Side of Up-stream : Plum Concrete blocks
Bank Protection Left Side of Down-stream : Plum Concrete blocks
Bank Protection Right Side of Down-stream : Plum Concrete blocks
Floor Protection on Up-stream : no protection work provided
Floor Protection on Down-stream : no protection work provided
Tratment for Corrosion Protection (if any) : no special treatment provided