Bridge (ID- 1295 ) Inventory Report

BBB km.26 bridge On Chainage 25.100 of Badethi Banchora Bhadrigad state highway

Data finalized On 03 Dec 2022

By AMIT CHAUHAN

Last Rated On 12 Jun 2024

Rating 0.45%

Categorized As

XXXXX on XX-XX-XXXX

In District : Uttarkashi Under Division : CD Uttarkashi

General

Bridge Type : Motor Bridge High Level
Structure No : 25/4
Feature Intersected : Local River
Name of Bridge : BBB km.26 bridge
Nearest Town : barethi
Latitude (Northing) : 30.62888889
Longitude (Easting) : 78.23916667
Construction Year : 1970
Inventory Year : 2021

Geometric

Overall length (in meter) : 12.40
Total No of Span : 1
Maximuam Span (in meter) : 11.40
Span Arragment : 1x11.40
No of Lane : 1.000
Overall Width (m) : 4.000
Carriageway Width (m) : 3.500
RS Footpath Width (m) : 0.000
LS Footpath Width (m) : 0.000
Approch Width i/c Shoulders (m) : 7.000
Gradient (%age) : 0
Skew Angle (degree) : 0.00
Radius of Curve in Plan (if Any) : 0.00

Design Data

HFL Highest Flood Level :
OFL Ordinary Flood Level :
LWL Low Water Level :
Design Velocity (m/Sec) :
Design Discharge (Cumecs) :
Soffit Level at Centre :
Road Level at Centre :
Design Scour Level at Pier :
Design Scour Level at Abutments :
Exposure Condition : Moderate
Seismic Importance factor : 0.0
Design Loading : NA
Load Rating : NA

Super-Structure

Superstructure Type : T-beam and slab
Superstructure Material : Reinforced concrete
Wearing Coat Type : Cement Concrete
Expension Joint Type : Single Strip/Box Seal Joint
Railing/Crash Barrier type : Cast-in-situ concrete
Bearing type : Not Provided

Sub-Structure

Founding Strata : Rocky
Abutment Foundation Type : Raft
Pier Foundation Type : NA
No of Piers : 0
Abutment Type : Stone Masonry
Pier Type : NA

Protection Work

Bank Protection Left Side of Up-stream : no protection work provided
Bank Protection Right Side of Up-stream : no protection work provided
Bank Protection Left Side of Down-stream : no protection work provided
Bank Protection Right Side of Down-stream : no protection work provided
Floor Protection on Up-stream : no protection work provided
Floor Protection on Down-stream : no protection work provided
Tratment for Corrosion Protection (if any) : no special treatment provided