Bridge (ID- 1302 ) Inventory Report

Sadhunagar to Pahasani Road Bridge On Chainage 1.000 of Pahsaini to Balkheda Link Road

Data finalized On 25 Feb 2022

By Er. Arun Kumar Saini

Last Rated On 09 Dec 2024

Rating 0.00%

Categorized As

XXXXX on XX-XX-XXXX

In District : Udham Singh Nagar Under Division : CD Khatima

General

Bridge Type : Motor Bridge High Level
Structure No : 1/1
Feature Intersected : Local River
Name of Bridge : Sadhunagar to Pahasani Road Bridge
Nearest Town : Nanakmatta
Latitude (Northing) : 29.01747500
Longitude (Easting) : 79.72814700
Construction Year : 2009
Inventory Year : 2021

Geometric

Overall length (in meter) : 18.00
Total No of Span : 3
Maximuam Span (in meter) : 6.00
Span Arragment : 3x6M
No of Lane : 1.000
Overall Width (m) : 7.500
Carriageway Width (m) : 7.500
RS Footpath Width (m) : 0.000
LS Footpath Width (m) : 0.000
Approch Width i/c Shoulders (m) : 7.500
Gradient (%age) : 0
Skew Angle (degree) : 0.00
Radius of Curve in Plan (if Any) : 0.00

Design Data

HFL Highest Flood Level :
OFL Ordinary Flood Level :
LWL Low Water Level :
Design Velocity (m/Sec) :
Design Discharge (Cumecs) :
Soffit Level at Centre :
Road Level at Centre :
Design Scour Level at Pier :
Design Scour Level at Abutments :
Exposure Condition : Moderate
Seismic Importance factor : 1.0
Design Loading : Class A
Load Rating : Class A

Super-Structure

Superstructure Type : Solid slab
Superstructure Material : Reinforced concrete
Wearing Coat Type : Cement Concrete
Expension Joint Type : Compression Seal Joint
Railing/Crash Barrier type : other
Bearing type : Not Provided

Sub-Structure

Founding Strata : Soft clayey
Abutment Foundation Type : Open
Pier Foundation Type : Open
No of Piers : 2
Abutment Type : Brick Masonry
Pier Type : Brick Masonry

Protection Work

Bank Protection Left Side of Up-stream : no protection work provided
Bank Protection Right Side of Up-stream : no protection work provided
Bank Protection Left Side of Down-stream : no protection work provided
Bank Protection Right Side of Down-stream : no protection work provided
Floor Protection on Up-stream : no protection work provided
Floor Protection on Down-stream : no protection work provided
Tratment for Corrosion Protection (if any) : no special treatment provided