Bridge (ID- 1305 ) Inventory Report

Khatima Melaghat Road Km 9 On Chainage 8.825 of Khatima Melaghat Road

Data finalized On 27 Feb 2022

By prakash singh

Last Rated On 18 Nov 2023

Rating 0.00%

Categorized As

XXXXX on XX-XX-XXXX

In District : Udham Singh Nagar Under Division : CD Khatima

General

Bridge Type : Motor Bridge High Level
Structure No : 22
Feature Intersected : Local Nala
Name of Bridge : Khatima Melaghat Road Km 9
Nearest Town : Khatima
Latitude (Northing) : 28.86361100
Longitude (Easting) : 80.03907500
Construction Year : 1976
Inventory Year : 2021

Geometric

Overall length (in meter) : 15.00
Total No of Span : 4
Maximuam Span (in meter) : 11.00
Span Arragment : 1x2.2+1x2.2+1x2.2+1x2.2+1x2.2
No of Lane : 2.000
Overall Width (m) : 8.500
Carriageway Width (m) : 6.400
RS Footpath Width (m) : 0.000
LS Footpath Width (m) : 0.000
Approch Width i/c Shoulders (m) : 12.000
Gradient (%age) : 0
Skew Angle (degree) : 0.00
Radius of Curve in Plan (if Any) : 0.00

Design Data

HFL Highest Flood Level :
OFL Ordinary Flood Level :
LWL Low Water Level :
Design Velocity (m/Sec) :
Design Discharge (Cumecs) :
Soffit Level at Centre :
Road Level at Centre :
Design Scour Level at Pier :
Design Scour Level at Abutments :
Exposure Condition : Moderate
Seismic Importance factor : 1.0
Design Loading : Class B
Load Rating : Class B

Super-Structure

Superstructure Type : Arch
Superstructure Material : Masonry
Wearing Coat Type : Bituminous Concrete
Expension Joint Type : Other
Railing/Crash Barrier type : Not Provided
Bearing type : other

Sub-Structure

Founding Strata : Soft clayey
Abutment Foundation Type : Open
Pier Foundation Type : Open
No of Piers : 4
Abutment Type : Stone Masonry
Pier Type : Brick Masonry

Protection Work

Bank Protection Left Side of Up-stream : no protection work provided
Bank Protection Right Side of Up-stream : no protection work provided
Bank Protection Left Side of Down-stream : no protection work provided
Bank Protection Right Side of Down-stream : no protection work provided
Floor Protection on Up-stream : no protection work provided
Floor Protection on Down-stream : no protection work provided
Tratment for Corrosion Protection (if any) : no special treatment provided