Bridge (ID- 131 ) Inventory Report

sira bridge On Chainage 75.400 of Silkyara Bangaon Chapda Sarot state highway

Data finalized On 03 Dec 2022

By Ajay Dobriyal

Last Rated On 29 May 2024

Rating 1.01%

Categorized As

XXXXX on XX-XX-XXXX

In District : Uttarkashi Under Division : CD Uttarkashi

General

Bridge Type : Motor Bridge High Level
Structure No : 75/16
Feature Intersected : nandour gaad
Name of Bridge : sira bridge
Nearest Town : badeti
Latitude (Northing) : 30.59860800
Longitude (Easting) : 78.22111300
Construction Year : 1986
Inventory Year : 2021

Geometric

Overall length (in meter) : 20.30
Total No of Span : 1
Maximuam Span (in meter) : 20.30
Span Arragment : 1x20.30
No of Lane : 1.000
Overall Width (m) : 4.550
Carriageway Width (m) : 4.000
RS Footpath Width (m) : 0.000
LS Footpath Width (m) : 0.000
Approch Width i/c Shoulders (m) : 5.250
Gradient (%age) : 0
Skew Angle (degree) : 0.00
Radius of Curve in Plan (if Any) : 0.00

Design Data

HFL Highest Flood Level :
OFL Ordinary Flood Level :
LWL Low Water Level :
Design Velocity (m/Sec) :
Design Discharge (Cumecs) :
Soffit Level at Centre :
Road Level at Centre :
Design Scour Level at Pier :
Design Scour Level at Abutments :
Exposure Condition : Moderate
Seismic Importance factor : 1.0
Design Loading : Class A
Load Rating : Class A

Super-Structure

Superstructure Type : T-beam and slab
Superstructure Material : Reinforced concrete
Wearing Coat Type : Cement Concrete
Expension Joint Type : Single Strip/Box Seal Joint
Railing/Crash Barrier type : Cast-in-situ concrete
Bearing type : Roller & Rocker

Sub-Structure

Founding Strata : Rocky
Abutment Foundation Type : Raft
Pier Foundation Type : NA
No of Piers : 0
Abutment Type : Stone Masonry
Pier Type : NA

Protection Work

Bank Protection Left Side of Up-stream : no protection work provided
Bank Protection Right Side of Up-stream : no protection work provided
Bank Protection Left Side of Down-stream : no protection work provided
Bank Protection Right Side of Down-stream : no protection work provided
Floor Protection on Up-stream : no protection work provided
Floor Protection on Down-stream : no protection work provided
Tratment for Corrosion Protection (if any) : no special treatment provided