Bridge (ID- 1315 ) Inventory Report

Leematoda Bridge On Chainage 0.075 of Kanalichna Pipli road via Sangadi to Ambaedkar village Leeatoda motor road

Data finalized On 19 Nov 2022

By Manish Singh Kha

Last Rated On 15 Jun 2024

Rating 3.04%

Categorized As

XXXXX on XX-XX-XXXX

In District : Pithoragarh Under Division : CD Askote

General

Bridge Type : Motor Bridge High Level
Structure No : 1/1
Feature Intersected : Sangdi Gad
Name of Bridge : Leematoda Bridge
Nearest Town : Sangri , Chharendev
Latitude (Northing) : 29.67350000
Longitude (Easting) : 80.30815800
Construction Year : 2008
Inventory Year : 2021

Geometric

Overall length (in meter) : 18.00
Total No of Span : 1
Maximuam Span (in meter) : 18.00
Span Arragment : 1x18
No of Lane : 1.000
Overall Width (m) : 4.750
Carriageway Width (m) : 4.250
RS Footpath Width (m) : 0.000
LS Footpath Width (m) : 0.000
Approch Width i/c Shoulders (m) : 6.000
Gradient (%age) : 0
Skew Angle (degree) : 0.00
Radius of Curve in Plan (if Any) : 0.00

Design Data

HFL Highest Flood Level :
OFL Ordinary Flood Level :
LWL Low Water Level :
Design Velocity (m/Sec) :
Design Discharge (Cumecs) :
Soffit Level at Centre :
Road Level at Centre :
Design Scour Level at Pier :
Design Scour Level at Abutments :
Exposure Condition : Moderate
Seismic Importance factor : 1.0
Design Loading : Class B
Load Rating : Class B

Super-Structure

Superstructure Type : Truss
Superstructure Material : Steel
Wearing Coat Type : Cement Concrete
Expension Joint Type : Single Strip/Box Seal Joint
Railing/Crash Barrier type : Steel rolled section
Bearing type : Roller & Rocker

Sub-Structure

Founding Strata : Rocky
Abutment Foundation Type : Open
Pier Foundation Type : NA
No of Piers : 0
Abutment Type : Stone Masonry
Pier Type : NA

Protection Work

Bank Protection Left Side of Up-stream : no protection work provided
Bank Protection Right Side of Up-stream : no protection work provided
Bank Protection Left Side of Down-stream : no protection work provided
Bank Protection Right Side of Down-stream : no protection work provided
Floor Protection on Up-stream : no protection work provided
Floor Protection on Down-stream : no protection work provided
Tratment for Corrosion Protection (if any) : no special treatment provided