Bridge (ID- 1326 ) Inventory Report

Pre stressed RCC bridge On Chainage 48.600 of Pauri Devpryag Gaja Jajal state highway

Data finalized On 18 Dec 2023

By Ashok tamta

Last Rated On 07 Nov 2024

Rating 0.22%

Categorized As

XXXXX on XX-XX-XXXX

In District : Pauri Under Division : PD Pauri

General

Bridge Type : Motor Bridge High Level
Structure No : 48/1
Feature Intersected : Ganga River
Name of Bridge : Pre stressed RCC bridge
Nearest Town : Devprayag
Latitude (Northing) : 30.14066944
Longitude (Easting) : 78.59628888
Construction Year : 2001
Inventory Year : 2022

Geometric

Overall length (in meter) : 160.80
Total No of Span : 3
Maximuam Span (in meter) : 80.00
Span Arragment : 1x31.80m+1x80 +1x42.20
No of Lane : 1.000
Overall Width (m) : 8.400
Carriageway Width (m) : 7.500
RS Footpath Width (m) : 0.000
LS Footpath Width (m) : 0.000
Approch Width i/c Shoulders (m) : 8.400
Gradient (%age) : 0
Skew Angle (degree) : 0.00
Radius of Curve in Plan (if Any) : 0.00

Design Data

HFL Highest Flood Level :
OFL Ordinary Flood Level :
LWL Low Water Level :
Design Velocity (m/Sec) :
Design Discharge (Cumecs) :
Soffit Level at Centre :
Road Level at Centre :
Design Scour Level at Pier :
Design Scour Level at Abutments :
Exposure Condition : Moderate
Seismic Importance factor : 1.0
Design Loading : Class 70R
Load Rating : Class 70R

Super-Structure

Superstructure Type : T-beam and slab
Superstructure Material : Reinforced concrete
Wearing Coat Type : Cement Concrete
Expension Joint Type : Single Strip/Box Seal Joint
Railing/Crash Barrier type : Pre-cast concrete
Bearing type : POT PIN

Sub-Structure

Founding Strata : Rocky
Abutment Foundation Type : Open
Pier Foundation Type : Well
No of Piers : 0
Abutment Type : Stone Masonry
Pier Type : RCC Solid

Protection Work

Bank Protection Left Side of Up-stream : no protection work provided
Bank Protection Right Side of Up-stream : no protection work provided
Bank Protection Left Side of Down-stream : no protection work provided
Bank Protection Right Side of Down-stream : no protection work provided
Floor Protection on Up-stream : no protection work provided
Floor Protection on Down-stream : no protection work provided
Tratment for Corrosion Protection (if any) : no special treatment provided