Bridge (ID- 1327 ) Inventory Report

Yamuna Bridge On Chainage 43.915 of Starting from its junction with NH - 72 connecting Vikasnager Kalsi Barkot and terminating at junction with NH- 94 near Barkot bend national highway

Data Yet Not Finalized

Last Rated On 18 May 2024

Rating 0.00%

Categorized As

XXXXX on XX-XX-XXXX

In District : Dehradun Under Division : NH Badkot

General

Bridge Type : Motor Bridge High Level
Structure No : 44/1
Feature Intersected : Yamuna River
Name of Bridge : Yamuna Bridge
Nearest Town : Mussoorie bend
Latitude (Northing) : 30.51027800
Longitude (Easting) : 77.98361100
Construction Year : 1962
Inventory Year : 2021

Geometric

Overall length (in meter) : 69.50
Total No of Span : 1
Maximuam Span (in meter) : 69.50
Span Arragment : 1*69.5
No of Lane : 1.000
Overall Width (m) : 5.000
Carriageway Width (m) : 4.250
RS Footpath Width (m) : 0.000
LS Footpath Width (m) : 0.000
Approch Width i/c Shoulders (m) : 6.550
Gradient (%age) : 0
Skew Angle (degree) : 0.00
Radius of Curve in Plan (if Any) : 0.00

Design Data

HFL Highest Flood Level :
OFL Ordinary Flood Level :
LWL Low Water Level :
Design Velocity (m/Sec) :
Design Discharge (Cumecs) :
Soffit Level at Centre :
Road Level at Centre :
Design Scour Level at Pier :
Design Scour Level at Abutments :
Exposure Condition : Moderate
Seismic Importance factor : 1.0
Design Loading : Class B
Load Rating : NA

Super-Structure

Superstructure Type : Truss
Superstructure Material : Steel
Wearing Coat Type : Cement Concrete
Expension Joint Type : Other
Railing/Crash Barrier type : Steel rolled section
Bearing type : Roller & Rocker

Sub-Structure

Founding Strata : Rocky
Abutment Foundation Type : Open
Pier Foundation Type : NA
No of Piers : 0
Abutment Type : Stone Masonry
Pier Type : NA

Protection Work

Bank Protection Left Side of Up-stream : protection work wit PCC block provided
Bank Protection Right Side of Up-stream : protection work wit PCC block provided
Bank Protection Left Side of Down-stream : protection work wit PCC block provided
Bank Protection Right Side of Down-stream : protection work wit PCC block provided
Floor Protection on Up-stream : no protection work provided
Floor Protection on Down-stream : no protection work provided
Tratment for Corrosion Protection (if any) : Bridge has been painted