Bridge (ID- 1340 ) Inventory Report

Siralikhet RCC bridge On Chainage 6.215 of Pithoragarh Jhulaghat state highway (SH)

Data finalized On 18 Nov 2022

By Ruchi Jangpangi

Last Rated On 23 May 2026

Rating 0.00%

Categorized As

XXXXX on XX-XX-XXXX

In District : Pithoragarh Under Division : PD Pithoragarh

General

Bridge Type : Motor Bridge High Level
Structure No : 1/7
Feature Intersected : Siralikhet gaar
Name of Bridge : Siralikhet RCC bridge
Nearest Town : Pithoragarh
Latitude (Northing) : 29.58000000
Longitude (Easting) : 80.29000000
Construction Year : 2019
Inventory Year : 2021
Work Code(s) : --

Geometric

Overall length (in meter) : 6.00
Total No of Span : 1
Maximuam Span (in meter) : 6.00
Span Arragment : 6
No of Lane : 1.000
Overall Width (m) : 6.500
Carriageway Width (m) : 6.500
RS Footpath Width (m) : 0.000
LS Footpath Width (m) : 0.000
Approch Width i/c Shoulders (m) : 6.500
Gradient (%age) : 0
Skew Angle (degree) : 0.00
Radius of Curve in Plan (if Any) : 0.00

Design Data

HFL Highest Flood Level :
OFL Ordinary Flood Level :
LWL Low Water Level :
Design Velocity (m/Sec) :
Design Discharge (Cumecs) :
Soffit Level at Centre :
Road Level at Centre :
Design Scour Level at Pier :
Design Scour Level at Abutments :
Exposure Condition : Moderate
Seismic Importance factor : 1.0
Design Loading : Class A
Load Rating : Class A

Super-Structure

Superstructure Type : T-beam and slab
Superstructure Material : Reinforced concrete
Wearing Coat Type : Cement Concrete
Expension Joint Type : Single Strip/Box Seal Joint
Railing/Crash Barrier type : Tubular steel
Bearing type : Elastomeric

Sub-Structure

Founding Strata : Rocky
Abutment Foundation Type : Open
Pier Foundation Type : Well
No of Piers : 0
Abutment Type : Stone Masonry
Pier Type : RCC Solid

Protection Work

Bank Protection Left Side of Up-stream : no protection work provided
Bank Protection Right Side of Up-stream : no protection work provided
Bank Protection Left Side of Down-stream : no protection work provided
Bank Protection Right Side of Down-stream : no protection work provided
Floor Protection on Up-stream : no protection work provided
Floor Protection on Down-stream : no protection work provided
Tratment for Corrosion Protection (if any) : no special treatment provided