Bridge (ID- 1344 ) Inventory Report

RIKHNIKHAL-BANJADEVI SUSPENSION BRIDGE -1 On Chainage 13.000 of Banjadevi Rikhanikhal bridle road

Bridge Declared As Abandoned

On 06 Mar 2024

In District : Pauri Under Division : PD Lansdown

General

Bridge Type : Pedestrain Bridge
Structure No : 13/1
Feature Intersected : LOCAL RIVER
Name of Bridge : RIKHNIKHAL-BANJADEVI SUSPENSION BRIDGE -1
Nearest Town : BANJADEVI
Latitude (Northing) : 29.72768600
Longitude (Easting) : 78.88068100
Construction Year : 1980
Inventory Year : 2021

Geometric

Overall length (in meter) : 12.80
Total No of Span : 1
Maximuam Span (in meter) : 12.80
Span Arragment : 1X12.80
No of Lane : 1.000
Overall Width (m) : 1.830
Carriageway Width (m) : 1.830
RS Footpath Width (m) : 0.000
LS Footpath Width (m) : 0.000
Approch Width i/c Shoulders (m) : 1.830
Gradient (%age) : 0
Skew Angle (degree) : 0.00
Radius of Curve in Plan (if Any) : 0.00

Design Data

HFL Highest Flood Level :
OFL Ordinary Flood Level :
LWL Low Water Level :
Design Velocity (m/Sec) :
Design Discharge (Cumecs) :
Soffit Level at Centre :
Road Level at Centre :
Design Scour Level at Pier :
Design Scour Level at Abutments :
Exposure Condition : Moderate
Seismic Importance factor : 0.0
Design Loading : Footpath Live Load
Load Rating : Footpath Live Load

Super-Structure

Superstructure Type : T-beam and slab
Superstructure Material : Pre-stressed concrete
Wearing Coat Type : Cement Concrete
Expension Joint Type : Other
Railing/Crash Barrier type : Steel rolled section
Bearing type : Roller & Rocker

Sub-Structure

Founding Strata : Rocky
Abutment Foundation Type : Open
Pier Foundation Type : NA
No of Piers : 0
Abutment Type : Stone Masonry
Pier Type : NA

Protection Work

Bank Protection Left Side of Up-stream : no protection work provided
Bank Protection Right Side of Up-stream : no protection work provided
Bank Protection Left Side of Down-stream : no protection work provided
Bank Protection Right Side of Down-stream : no protection work provided
Floor Protection on Up-stream : no protection work provided
Floor Protection on Down-stream : no protection work provided
Tratment for Corrosion Protection (if any) : no special treatment provided