Bridge (ID- 1348 ) Inventory Report

R.C.C Bridge Over Thala gadhera in km 02 On Chainage 1.800 of Pokhari Harisankar motor road to Thauli Thalabend motor road

Data finalized On 06 Dec 2023

By Er. Ashok Maikhuri

Last Rated On 24 Nov 2024

Rating 0.86%

Categorized As

XXXXX on XX-XX-XXXX

In District : Chamoli Under Division : CD Pokhari

General

Bridge Type : Motor Bridge High Level
Structure No : 2/2
Feature Intersected : Thala Gadhera
Name of Bridge : R.C.C Bridge Over Thala gadhera in km 02
Nearest Town : Nagnath Pokhari
Latitude (Northing) : 30.37072700
Longitude (Easting) : 79.15879400
Construction Year : 2019
Inventory Year : 2021

Geometric

Overall length (in meter) : 15.00
Total No of Span : 1
Maximuam Span (in meter) : 15.00
Span Arragment : 1x15
No of Lane : 1.000
Overall Width (m) : 5.000
Carriageway Width (m) : 4.250
RS Footpath Width (m) : 0.000
LS Footpath Width (m) : 0.000
Approch Width i/c Shoulders (m) : 6.000
Gradient (%age) : 0
Skew Angle (degree) : 0.00
Radius of Curve in Plan (if Any) : 0.00

Design Data

HFL Highest Flood Level :
OFL Ordinary Flood Level :
LWL Low Water Level :
Design Velocity (m/Sec) :
Design Discharge (Cumecs) :
Soffit Level at Centre :
Road Level at Centre :
Design Scour Level at Pier :
Design Scour Level at Abutments :
Exposure Condition : Moderate
Seismic Importance factor : 0.0
Design Loading : Class B
Load Rating : Class B

Super-Structure

Superstructure Type : T-beam and slab
Superstructure Material : Reinforced concrete
Wearing Coat Type : Cement Concrete
Expension Joint Type : Not Provided
Railing/Crash Barrier type : Cast-in-situ concrete
Bearing type : Not Provided

Sub-Structure

Founding Strata : Rocky
Abutment Foundation Type : Raft
Pier Foundation Type : NA
No of Piers : 0
Abutment Type : Stone Masonry
Pier Type : NA

Protection Work

Bank Protection Left Side of Up-stream : Plum Concrete
Bank Protection Right Side of Up-stream : Plum Concrete
Bank Protection Left Side of Down-stream : Plum Concrete
Bank Protection Right Side of Down-stream : Plum Concrete
Floor Protection on Up-stream : Cement concrete
Floor Protection on Down-stream : no protection work provided
Tratment for Corrosion Protection (if any) : no special treatment provided