Bridge (ID- 1350 ) Inventory Report

Chtawapipal Suspension Bridge Over Alaknanda River On Chainage 0.500 of Chatwapipal Pokhari bridle road

Data finalized On 21 Nov 2023

By Er. Kuldeep Rawat

Last Rated On 11 Jun 2024

Rating 9.09%

Categorized As

XXXXX on XX-XX-XXXX

In District : Chamoli Under Division : CD Pokhari

General

Bridge Type : Pedestrain Bridge
Structure No : 1/1
Feature Intersected : Alaknanda River
Name of Bridge : Chtawapipal Suspension Bridge Over Alaknanda River
Nearest Town : Gauchar
Latitude (Northing) : 30.26954700
Longitude (Easting) : 79.17073200
Construction Year : 1905
Inventory Year : 2021

Geometric

Overall length (in meter) : 79.00
Total No of Span : 1
Maximuam Span (in meter) : 79.00
Span Arragment : 1x79
No of Lane : 1.000
Overall Width (m) : 1.800
Carriageway Width (m) : 1.800
RS Footpath Width (m) : 0.000
LS Footpath Width (m) : 0.000
Approch Width i/c Shoulders (m) : 3.000
Gradient (%age) : 0
Skew Angle (degree) : 0.00
Radius of Curve in Plan (if Any) : 0.00

Design Data

HFL Highest Flood Level :
OFL Ordinary Flood Level :
LWL Low Water Level :
Design Velocity (m/Sec) :
Design Discharge (Cumecs) :
Soffit Level at Centre :
Road Level at Centre :
Design Scour Level at Pier :
Design Scour Level at Abutments :
Exposure Condition : Moderate
Seismic Importance factor : 1.0
Design Loading : Footpath Live Load
Load Rating : Footpath Live Load

Super-Structure

Superstructure Type : Cable stayed
Superstructure Material : Steel
Wearing Coat Type : Bituminous Concrete
Expension Joint Type : Not Provided
Railing/Crash Barrier type : Steel rolled section
Bearing type : Not Provided

Sub-Structure

Founding Strata : Rocky
Abutment Foundation Type : Raft
Pier Foundation Type : NA
No of Piers : 0
Abutment Type : Stone Masonry
Pier Type : NA

Protection Work

Bank Protection Left Side of Up-stream : no protection work provided
Bank Protection Right Side of Up-stream : no protection work provided
Bank Protection Left Side of Down-stream : no protection work provided
Bank Protection Right Side of Down-stream : no protection work provided
Floor Protection on Up-stream : no protection work provided
Floor Protection on Down-stream : no protection work provided
Tratment for Corrosion Protection (if any) : no special treatment provided