Bridge (ID- 1352 ) Inventory Report

Steei Girder Pedestrain Bridge over Khoonigad in km 5.200 On Chainage 5.200 of Chatwapipal Pokhari bridle road

Data finalized On 07 Dec 2023

By Kuldeep singh Rawat

Last Rated On 27 Nov 2024

Rating 1.82%

Categorized As

XXXXX on XX-XX-XXXX

In District : Chamoli Under Division : CD Pokhari

General

Bridge Type : Pedestrain Bridge
Structure No : 6/1
Feature Intersected : Khoonigadh
Name of Bridge : Steei Girder Pedestrain Bridge over Khoonigad in km 5.200
Nearest Town : Gauchar
Latitude (Northing) : 30.28512700
Longitude (Easting) : 79.18312900
Construction Year : 1980
Inventory Year : 2023

Geometric

Overall length (in meter) : 13.07
Total No of Span : 1
Maximuam Span (in meter) : 13.07
Span Arragment : 1x13.07
No of Lane : 1.000
Overall Width (m) : 1.700
Carriageway Width (m) : 1.700
RS Footpath Width (m) : 0.000
LS Footpath Width (m) : 0.000
Approch Width i/c Shoulders (m) : 3.000
Gradient (%age) : 0
Skew Angle (degree) : 0.00
Radius of Curve in Plan (if Any) : 0.00

Design Data

HFL Highest Flood Level :
OFL Ordinary Flood Level :
LWL Low Water Level :
Design Velocity (m/Sec) :
Design Discharge (Cumecs) :
Soffit Level at Centre :
Road Level at Centre :
Design Scour Level at Pier :
Design Scour Level at Abutments :
Exposure Condition : Moderate
Seismic Importance factor : 0.0
Design Loading : Footpath Live Load
Load Rating : Footpath Live Load

Super-Structure

Superstructure Type : Truss
Superstructure Material : Steel
Wearing Coat Type : Cement Concrete
Expension Joint Type : Not Provided
Railing/Crash Barrier type : Steel rolled section
Bearing type : Not Provided

Sub-Structure

Founding Strata : Rocky
Abutment Foundation Type : Raft
Pier Foundation Type : NA
No of Piers : 0
Abutment Type : Stone Masonry
Pier Type : NA

Protection Work

Bank Protection Left Side of Up-stream : no protection work provided
Bank Protection Right Side of Up-stream : no protection work provided
Bank Protection Left Side of Down-stream : no protection work provided
Bank Protection Right Side of Down-stream : no protection work provided
Floor Protection on Up-stream : no protection work provided
Floor Protection on Down-stream : no protection work provided
Tratment for Corrosion Protection (if any) : no special treatment provided