Data finalized On 04 Jan 2024
By Er Neeraj Bhandari (JE), Er Gyanender Chaudhary (AE)
Last Rated On 13 Jun 2024
Rating 0.00%
Categorized As
XXXXX on XX-XX-XXXX
In District : Chamoli Under Division : PD Gopeshwar
General
Bridge Type :
Pedestrain Bridge
Structure No :
59/1
Feature Intersected :
Dhauliganga River
Name of Bridge :
ITBP CAMP BURANSH (MALARI) SUSPENSION BRIDGE
Nearest Town :
ITBP Camp Malari
Latitude (Northing) :
30.70086500
Longitude (Easting) :
79.88257600
Construction Year :
2023
Inventory Year :
2023
Geometric
Overall length (in meter) :
30.00
Total No of Span :
1
Maximuam Span (in meter) :
30.00
Span Arragment :
1x30
No of Lane :
1.000
Overall Width (m) :
2.100
Carriageway Width (m) :
1.800
RS Footpath Width (m) :
0.000
LS Footpath Width (m) :
0.000
Approch Width i/c Shoulders (m) :
2.000
Gradient (%age) :
0
Skew Angle (degree) :
0.00
Radius of Curve in Plan (if Any) :
0.00
Design Data
HFL Highest Flood Level :
2891.000
OFL Ordinary Flood Level :
2889.000
LWL Low Water Level :
2888.500
Design Velocity (m/Sec) :
Design Discharge (Cumecs) :
Soffit Level at Centre :
Road Level at Centre :
Design Scour Level at Pier :
Design Scour Level at Abutments :
Exposure Condition :
Moderate
Seismic Importance factor :
1.5
Design Loading :
Footpath Live Load
Load Rating :
Footpath Live Load
Super-Structure
Superstructure Type :
Truss
Superstructure Material :
Steel
Wearing Coat Type :
Not Provided
Expension Joint Type :
Single Strip/Box Seal Joint
Railing/Crash Barrier type :
Steel rolled section
Bearing type :
Elastomeric
Sub-Structure
Founding Strata :
Rocky
Abutment Foundation Type :
Open
Pier Foundation Type :
NA
No of Piers :
0
Abutment Type :
RCC spill through type
Pier Type :
NA
Protection Work
Bank Protection Left Side of Up-stream :
protection work provided
Bank Protection Right Side of Up-stream :
protection work provided
Bank Protection Left Side of Down-stream :
protection work provided
Bank Protection Right Side of Down-stream :
protection work provided
Floor Protection on Up-stream :
no protection work provided
Floor Protection on Down-stream :
no protection work provided
Tratment for Corrosion Protection (if any) :
no special treatment provided