Bridge (ID- 1395 ) Inventory Report

ITBP CAMP BURANSH (MALARI) SUSPENSION BRIDGE

Data finalized On 04 Jan 2024

By Er Neeraj Bhandari (JE), Er Gyanender Chaudhary (AE)

Last Rated On 13 Jun 2024

Rating 0.00%

Categorized As

XXXXX on XX-XX-XXXX

In District : Chamoli Under Division : PD Gopeshwar

General

Bridge Type : Pedestrain Bridge
Structure No : 59/1
Feature Intersected : Dhauliganga River
Name of Bridge : ITBP CAMP BURANSH (MALARI) SUSPENSION BRIDGE
Nearest Town : ITBP Camp Malari
Latitude (Northing) : 30.70086500
Longitude (Easting) : 79.88257600
Construction Year : 2023
Inventory Year : 2023

Geometric

Overall length (in meter) : 30.00
Total No of Span : 1
Maximuam Span (in meter) : 30.00
Span Arragment : 1x30
No of Lane : 1.000
Overall Width (m) : 2.100
Carriageway Width (m) : 1.800
RS Footpath Width (m) : 0.000
LS Footpath Width (m) : 0.000
Approch Width i/c Shoulders (m) : 2.000
Gradient (%age) : 0
Skew Angle (degree) : 0.00
Radius of Curve in Plan (if Any) : 0.00

Design Data

HFL Highest Flood Level : 2891.000
OFL Ordinary Flood Level : 2889.000
LWL Low Water Level : 2888.500
Design Velocity (m/Sec) :
Design Discharge (Cumecs) :
Soffit Level at Centre :
Road Level at Centre :
Design Scour Level at Pier :
Design Scour Level at Abutments :
Exposure Condition : Moderate
Seismic Importance factor : 1.5
Design Loading : Footpath Live Load
Load Rating : Footpath Live Load

Super-Structure

Superstructure Type : Truss
Superstructure Material : Steel
Wearing Coat Type : Not Provided
Expension Joint Type : Single Strip/Box Seal Joint
Railing/Crash Barrier type : Steel rolled section
Bearing type : Elastomeric

Sub-Structure

Founding Strata : Rocky
Abutment Foundation Type : Open
Pier Foundation Type : NA
No of Piers : 0
Abutment Type : RCC spill through type
Pier Type : NA

Protection Work

Bank Protection Left Side of Up-stream : protection work provided
Bank Protection Right Side of Up-stream : protection work provided
Bank Protection Left Side of Down-stream : protection work provided
Bank Protection Right Side of Down-stream : protection work provided
Floor Protection on Up-stream : no protection work provided
Floor Protection on Down-stream : no protection work provided
Tratment for Corrosion Protection (if any) : no special treatment provided