Data finalized On 04 Jan 2024
By Er Chandi Parsad Bhutt (JE), Er Umesh Dariya (AE)
Last Rated On 01 Dec 2024
Rating 0.00%
Categorized As
XXXXX on XX-XX-XXXX
In District : Chamoli Under Division : PD Gopeshwar
General
Bridge Type :
Pedestrain Bridge
Structure No :
3/1
Feature Intersected :
Alaknanda River
Name of Bridge :
Shri Badrinath Dham k sthan Mana village k pass Alaknanda River per Suspention bridge
Nearest Town :
Shri Badrinath and Mana village
Latitude (Northing) :
30.76954500
Longitude (Easting) :
79.49583400
Construction Year :
2016
Inventory Year :
2021
Geometric
Overall length (in meter) :
70.00
Total No of Span :
1
Maximuam Span (in meter) :
70.00
Span Arragment :
1x70
No of Lane :
1.000
Overall Width (m) :
1.830
Carriageway Width (m) :
1.830
RS Footpath Width (m) :
0.000
LS Footpath Width (m) :
0.000
Approch Width i/c Shoulders (m) :
2.000
Gradient (%age) :
0
Skew Angle (degree) :
0.00
Radius of Curve in Plan (if Any) :
0.00
Design Data
HFL Highest Flood Level :
OFL Ordinary Flood Level :
LWL Low Water Level :
Design Velocity (m/Sec) :
Design Discharge (Cumecs) :
Soffit Level at Centre :
Road Level at Centre :
Design Scour Level at Pier :
Design Scour Level at Abutments :
Exposure Condition :
Moderate
Seismic Importance factor :
1.0
Design Loading :
Footpath Live Load
Load Rating :
Footpath Live Load
Super-Structure
Superstructure Type :
Suspension
Superstructure Material :
Steel
Wearing Coat Type :
Cement Concrete
Expension Joint Type :
Not Provided
Railing/Crash Barrier type :
Steel rolled section
Bearing type :
Not Provided
Sub-Structure
Founding Strata :
Rocky
Abutment Foundation Type :
Open
Pier Foundation Type :
NA
No of Piers :
0
Abutment Type :
Stone Masonry
Pier Type :
NA
Protection Work
Bank Protection Left Side of Up-stream :
no protection work provided
Bank Protection Right Side of Up-stream :
protection work provided
Bank Protection Left Side of Down-stream :
no protection work provided
Bank Protection Right Side of Down-stream :
protection work provided
Floor Protection on Up-stream :
no protection work provided
Floor Protection on Down-stream :
no protection work provided
Tratment for Corrosion Protection (if any) :
no special treatment provided