Bridge (ID- 143 ) Inventory Report

Bridge On Chainage 26.700 of Haripur Ichadi Meenus state highway

Data finalized On 23 Dec 2022

By Pardeep Uniyal AAE Civil

Last Rated On 30 Jul 2024

Rating 0.00%

Categorized As

XXXXX on XX-XX-XXXX

In District : Dehradun Under Division : TD Sahiya

General

Bridge Type : Motor Bridge High Level
Structure No : 27/1
Feature Intersected : Koti Gard
Name of Bridge :
Nearest Town : Koti
Latitude (Northing) : 30.55861100
Longitude (Easting) : 77.78555500
Construction Year :
Inventory Year : 2021

Geometric

Overall length (in meter) : 7.20
Total No of Span : 1
Maximuam Span (in meter) : 7.20
Span Arragment : 1 X 7.20
No of Lane : 1.500
Overall Width (m) : 7.100
Carriageway Width (m) : 6.400
RS Footpath Width (m) : 0.000
LS Footpath Width (m) : 0.000
Approch Width i/c Shoulders (m) : 9.000
Gradient (%age) : 0
Skew Angle (degree) : 0.00
Radius of Curve in Plan (if Any) : 0.00

Design Data

HFL Highest Flood Level :
OFL Ordinary Flood Level :
LWL Low Water Level :
Design Velocity (m/Sec) :
Design Discharge (Cumecs) :
Soffit Level at Centre :
Road Level at Centre :
Design Scour Level at Pier :
Design Scour Level at Abutments :
Exposure Condition : Moderate
Seismic Importance factor : 1.0
Design Loading : NA
Load Rating : NA

Super-Structure

Superstructure Type : T-beam and slab
Superstructure Material : Reinforced concrete
Wearing Coat Type : Bituminous Concrete
Expension Joint Type : Single Strip/Box Seal Joint
Railing/Crash Barrier type : other
Bearing type : Not Provided

Sub-Structure

Founding Strata : Rocky
Abutment Foundation Type : Open
Pier Foundation Type : NA
No of Piers : 0
Abutment Type : Stone Masonry
Pier Type : NA

Protection Work

Bank Protection Left Side of Up-stream : no protection work provided
Bank Protection Right Side of Up-stream : no protection work provided
Bank Protection Left Side of Down-stream : no protection work provided
Bank Protection Right Side of Down-stream : no protection work provided
Floor Protection on Up-stream : no protection work provided
Floor Protection on Down-stream : no protection work provided
Tratment for Corrosion Protection (if any) : no special treatment provided