Bridge (ID- 1473 ) Inventory Report

GODI BADI On Chainage 40.610 of Starting from its junction with NH-58 near Meerut in the state of Uttar Pradesh and connecting Bijnor Najibabad Kotdwara Pauri and terminating at junction with NH -58 near Srinagar National Highway

Data finalized On 13 Jul 2023

By Arvind Joshi

Last Rated On 07 Jun 2024

Rating 0.00%

Categorized As

XXXXX on XX-XX-XXXX

In District : Pauri Under Division : NH Dhumakot

General

Bridge Type : Motor Bridge High Level
Structure No : 41/12
Feature Intersected : GODI BADI
Name of Bridge : GODI BADI
Nearest Town : DUGADDA
Latitude (Northing) : 29.81004800
Longitude (Easting) : 78.61515300
Construction Year : 2021
Inventory Year : 2021

Geometric

Overall length (in meter) : 11.00
Total No of Span : 1
Maximuam Span (in meter) : 11.00
Span Arragment : 1X11
No of Lane : 2.000
Overall Width (m) : 13.500
Carriageway Width (m) : 11.000
RS Footpath Width (m) : 1.500
LS Footpath Width (m) : 1.500
Approch Width i/c Shoulders (m) : 4.000
Gradient (%age) : 3
Skew Angle (degree) : 0.00
Radius of Curve in Plan (if Any) : 0.00

Design Data

HFL Highest Flood Level : 774.549
OFL Ordinary Flood Level :
LWL Low Water Level :
Design Velocity (m/Sec) : 4.03
Design Discharge (Cumecs) : 63.80
Soffit Level at Centre : 776.809
Road Level at Centre : 777.771
Design Scour Level at Pier :
Design Scour Level at Abutments : 778.661
Exposure Condition : Extreme
Seismic Importance factor : 1.0
Design Loading : Class AA
Load Rating : Class AA

Super-Structure

Superstructure Type : Solid slab
Superstructure Material : Reinforced concrete
Wearing Coat Type : Mastic asphalt
Expension Joint Type : Single Strip/Box Seal Joint
Railing/Crash Barrier type : Cast-in-situ concrete
Bearing type : Roller & Rocker

Sub-Structure

Founding Strata : Rocky
Abutment Foundation Type : Raft
Pier Foundation Type : NA
No of Piers : 0
Abutment Type : RCC counterfort type
Pier Type : NA

Protection Work

Bank Protection Left Side of Up-stream : RCC RETURN WALL
Bank Protection Right Side of Up-stream : RCC RETURN WALL
Bank Protection Left Side of Down-stream : RCC RETURN WALL
Bank Protection Right Side of Down-stream : RCC RETURN WALL
Floor Protection on Up-stream : REINFORCED CONCRETE
Floor Protection on Down-stream : REINFORCED CONCRETE
Tratment for Corrosion Protection (if any) : no special treatment provided