Bridge (ID- 1517 ) Inventory Report

RCC Slab On Chainage 9.000 of Bahadrabad Dhanori Imlikheda Bhagwanpur Gagal Haidi state highway

Data finalized On 09 Jan 2024

By Sanddep Rawat

Last Rated On 15 Jun 2024

Rating 1.46%

Categorized As

XXXXX on XX-XX-XXXX

In District : Haridwar Under Division : CD Roorkee

General

Bridge Type : Motor Bridge Submersible
Structure No : 1
Feature Intersected : Nala
Name of Bridge : RCC Slab
Nearest Town : Dhanori
Latitude (Northing) : 29.93661500
Longitude (Easting) : 77.93578300
Construction Year : 2015
Inventory Year : 2023

Geometric

Overall length (in meter) : 8.00
Total No of Span : 1
Maximuam Span (in meter) : 8.00
Span Arragment : 1x8
No of Lane : 1.000
Overall Width (m) : 6.500
Carriageway Width (m) : 6.500
RS Footpath Width (m) : 0.000
LS Footpath Width (m) : 0.000
Approch Width i/c Shoulders (m) : 5.500
Gradient (%age) : 0
Skew Angle (degree) : 0.00
Radius of Curve in Plan (if Any) : 0.00

Design Data

HFL Highest Flood Level :
OFL Ordinary Flood Level :
LWL Low Water Level :
Design Velocity (m/Sec) :
Design Discharge (Cumecs) :
Soffit Level at Centre :
Road Level at Centre :
Design Scour Level at Pier :
Design Scour Level at Abutments :
Exposure Condition : Moderate
Seismic Importance factor : 1.0
Design Loading : Class A
Load Rating : Class A

Super-Structure

Superstructure Type : Solid slab
Superstructure Material : Reinforced concrete
Wearing Coat Type : Cement Concrete
Expension Joint Type : Not Provided
Railing/Crash Barrier type : Cast-in-situ concrete
Bearing type : Not Provided

Sub-Structure

Founding Strata : Soft clayey
Abutment Foundation Type : Open
Pier Foundation Type : NA
No of Piers : 0
Abutment Type : Brick Masonry
Pier Type : NA

Protection Work

Bank Protection Left Side of Up-stream : protection work required
Bank Protection Right Side of Up-stream : protection work required
Bank Protection Left Side of Down-stream : no protection work provided
Bank Protection Right Side of Down-stream : no protection work provided
Floor Protection on Up-stream : protection work required
Floor Protection on Down-stream : protection work required
Tratment for Corrosion Protection (if any) : no special treatment provided