Bridge (ID- 1521 ) Inventory Report

Hill bypass to Bhupatwala via Kharkhari ROB On Chainage 7.000 of Hill Bye Pass Road

Data finalized On 20 Sep 2022

By Rajesh Kumar

Last Rated On 21 Nov 2024

Rating 0.06%

Categorized As

XXXXX on XX-XX-XXXX

In District : Dehradun Under Division : PD Haridwar

General

Bridge Type : Motor Bridge High Level
Structure No : 1
Feature Intersected : Sukhi Nadi
Name of Bridge : Hill bypass to Bhupatwala via Kharkhari ROB
Nearest Town : Bhupatwala
Latitude (Northing) : 29.97285730
Longitude (Easting) : 78.16986840
Construction Year : 2016
Inventory Year : 2021

Geometric

Overall length (in meter) : 204.00
Total No of Span : 19
Maximuam Span (in meter) : 30.00
Span Arragment : 6*25, 1*30, 2*12
No of Lane : 2.000
Overall Width (m) : 10.500
Carriageway Width (m) : 7.500
RS Footpath Width (m) : 1.500
LS Footpath Width (m) : 1.500
Approch Width i/c Shoulders (m) : 7.000
Gradient (%age) : 0
Skew Angle (degree) : 0.00
Radius of Curve in Plan (if Any) : 0.00

Design Data

HFL Highest Flood Level :
OFL Ordinary Flood Level :
LWL Low Water Level :
Design Velocity (m/Sec) :
Design Discharge (Cumecs) :
Soffit Level at Centre :
Road Level at Centre :
Design Scour Level at Pier :
Design Scour Level at Abutments :
Exposure Condition : Moderate
Seismic Importance factor : 1.0
Design Loading : Class A
Load Rating : Class A

Super-Structure

Superstructure Type : T-beam and slab
Superstructure Material : Reinforced concrete
Wearing Coat Type : Cement Concrete
Expension Joint Type : Single Strip/Box Seal Joint
Railing/Crash Barrier type : Tubular steel
Bearing type : Elastomeric

Sub-Structure

Founding Strata : Rocky
Abutment Foundation Type : Well
Pier Foundation Type : Well
No of Piers : 11
Abutment Type : Stone Masonry
Pier Type : RCC Solid

Protection Work

Bank Protection Left Side of Up-stream : no protection work provided
Bank Protection Right Side of Up-stream : no protection work provided
Bank Protection Left Side of Down-stream : no protection work provided
Bank Protection Right Side of Down-stream : no protection work provided
Floor Protection on Up-stream : no protection work provided
Floor Protection on Down-stream : no protection work provided
Tratment for Corrosion Protection (if any) : no special treatment provided