Bridge (ID- 153 ) Inventory Report

CHHATOLI BRIDGE On Chainage 9.881 of Rudarprayag Gorikund National Highway (NH)

Data finalized On 02 Feb 2024

By Er. Anurag Dev

Last Rated On 13 Jun 2025

Rating 0.88%

Categorized As

XXXXX on XX-XX-XXXX

In District : Rudraprayag Under Division : NH Div Rudraprayag

General

Bridge Type : Motor Bridge High Level
Structure No : 4
Feature Intersected : CHHATOLI NALA
Name of Bridge : CHHATOLI BRIDGE
Nearest Town : TILWARA
Latitude (Northing) : 30.33622000
Longitude (Easting) : 78.96906000
Construction Year : 2010
Inventory Year : 2024
Work Code(s) : --

Geometric

Overall length (in meter) : 16.50
Total No of Span : 1
Maximuam Span (in meter) : 16.50
Span Arragment : 1*16.5
No of Lane : 2.000
Overall Width (m) : 10.000
Carriageway Width (m) : 8.950
RS Footpath Width (m) : 0.000
LS Footpath Width (m) : 0.000
Approch Width i/c Shoulders (m) : 12.000
Gradient (%age) : 0
Skew Angle (degree) : 0.00
Radius of Curve in Plan (if Any) : 0.00

Design Data

HFL Highest Flood Level :
OFL Ordinary Flood Level :
LWL Low Water Level :
Design Velocity (m/Sec) :
Design Discharge (Cumecs) :
Soffit Level at Centre :
Road Level at Centre :
Design Scour Level at Pier :
Design Scour Level at Abutments :
Exposure Condition : Moderate
Seismic Importance factor : 0.0
Design Loading : Class A
Load Rating : Class A

Super-Structure

Superstructure Type : T-beam and slab
Superstructure Material : Reinforced concrete
Wearing Coat Type : Cement Concrete
Expension Joint Type : Single Strip/Box Seal Joint
Railing/Crash Barrier type : Tubular steel
Bearing type : POT PIN

Sub-Structure

Founding Strata : Rocky
Abutment Foundation Type : Open
Pier Foundation Type : NA
No of Piers : 0
Abutment Type : RCC Box type
Pier Type : NA

Protection Work

Bank Protection Left Side of Up-stream : no protection work provided
Bank Protection Right Side of Up-stream : no protection work provided
Bank Protection Left Side of Down-stream : no protection work provided
Bank Protection Right Side of Down-stream : no protection work provided
Floor Protection on Up-stream : no protection work provided
Floor Protection on Down-stream : no protection work provided
Tratment for Corrosion Protection (if any) : no special treatment provided