Bridge (ID- 1547 ) Inventory Report

Chaundiyat gad composit girder Bridge On Chainage 0.750 of Kamad Dhauntari Chamiyala Budhakedar Ayarkhal state highway

Data Yet Not Finalized

Last Rated On 15 May 2024

Rating 0.00%

Categorized As

XXXXX on XX-XX-XXXX

In District : Uttarkashi Under Division : PD Uttarkashi

General

Bridge Type : Motor Bridge High Level
Structure No : 1/4
Feature Intersected : Chaundiyatgad
Name of Bridge : Chaundiyat gad composit girder Bridge
Nearest Town : Dhauntri
Latitude (Northing) : 30.60777800
Longitude (Easting) : 78.51583330
Construction Year : 2022
Inventory Year : 2022

Geometric

Overall length (in meter) : 24.40
Total No of Span : 1
Maximuam Span (in meter) : 24.40
Span Arragment : 1x24.00
No of Lane : 1.500
Overall Width (m) : 6.500
Carriageway Width (m) : 5.500
RS Footpath Width (m) : 0.000
LS Footpath Width (m) : 0.000
Approch Width i/c Shoulders (m) : 5.950
Gradient (%age) : 0
Skew Angle (degree) : 0.00
Radius of Curve in Plan (if Any) : 0.00

Design Data

HFL Highest Flood Level :
OFL Ordinary Flood Level :
LWL Low Water Level :
Design Velocity (m/Sec) :
Design Discharge (Cumecs) :
Soffit Level at Centre :
Road Level at Centre :
Design Scour Level at Pier :
Design Scour Level at Abutments :
Exposure Condition : Moderate
Seismic Importance factor : 1.0
Design Loading : Class A
Load Rating : Class A

Super-Structure

Superstructure Type : Plate Girder
Superstructure Material : Composite
Wearing Coat Type : Cement Concrete
Expension Joint Type : Single Strip/Box Seal Joint
Railing/Crash Barrier type : Cast-in-situ concrete
Bearing type : Roller & Rocker

Sub-Structure

Founding Strata : Rocky
Abutment Foundation Type : Open
Pier Foundation Type : NA
No of Piers : 0
Abutment Type : RCC buttressed type
Pier Type : NA

Protection Work

Bank Protection Left Side of Up-stream : Gabians
Bank Protection Right Side of Up-stream : Gabians
Bank Protection Left Side of Down-stream : Gabians
Bank Protection Right Side of Down-stream : Gabians
Floor Protection on Up-stream : no protection work provided
Floor Protection on Down-stream : no protection work provided
Tratment for Corrosion Protection (if any) : Painted with Redoxide Primer