Bridge (ID- 1579 ) Inventory Report

RCC T beam Bridge km 83.625 On Chainage 83.625 of Silkyara Bangaon Chapda Sarot state highway

Data finalized On 27 Jul 2022

By Devesh Mohan Semwal

Last Rated On 25 Oct 2024

Rating 1.58%

Categorized As

XXXXX on XX-XX-XXXX

In District : Tehri Under Division : CD Chamba

General

Bridge Type : Motor Bridge High Level
Structure No : 84/4
Feature Intersected : Kyari Gad
Name of Bridge : RCC T beam Bridge km 83.625
Nearest Town : Chinyalisaur
Latitude (Northing) : 30.57644100
Longitude (Easting) : 78.24933300
Construction Year : 1994
Inventory Year : 2020

Geometric

Overall length (in meter) : 11.00
Total No of Span : 1
Maximuam Span (in meter) : 11.00
Span Arragment : 1x11
No of Lane : 1.000
Overall Width (m) : 3.750
Carriageway Width (m) : 3.250
RS Footpath Width (m) : 0.000
LS Footpath Width (m) : 0.000
Approch Width i/c Shoulders (m) : 3.750
Gradient (%age) : 0
Skew Angle (degree) : 0.00
Radius of Curve in Plan (if Any) : 0.00

Design Data

HFL Highest Flood Level :
OFL Ordinary Flood Level :
LWL Low Water Level :
Design Velocity (m/Sec) :
Design Discharge (Cumecs) :
Soffit Level at Centre :
Road Level at Centre :
Design Scour Level at Pier :
Design Scour Level at Abutments :
Exposure Condition : Moderate
Seismic Importance factor : 0.0
Design Loading : Class B
Load Rating : Class B

Super-Structure

Superstructure Type : T-beam and slab
Superstructure Material : Reinforced concrete
Wearing Coat Type : Cement Concrete
Expension Joint Type : Single Strip/Box Seal Joint
Railing/Crash Barrier type : Cast-in-situ concrete
Bearing type : Roller & Rocker

Sub-Structure

Founding Strata : Rocky
Abutment Foundation Type : Open
Pier Foundation Type : NA
No of Piers : 0
Abutment Type : Stone Masonry
Pier Type : NA

Protection Work

Bank Protection Left Side of Up-stream : no protection work provided
Bank Protection Right Side of Up-stream : no protection work provided
Bank Protection Left Side of Down-stream : no protection work provided
Bank Protection Right Side of Down-stream : no protection work provided
Floor Protection on Up-stream : no protection work provided
Floor Protection on Down-stream : no protection work provided
Tratment for Corrosion Protection (if any) : no special treatment provided