Bridge (ID- 159 ) Inventory Report

SYAAL SAUD BRIDGE On Chainage 28.563 of Rudarprayag Gorikund National Highway

Data finalized On 02 Feb 2024

By Er. Pushkar Pal Singh Bisht

Last Rated On 17 Nov 2023

Rating 0.84%

Categorized As

XXXXX on XX-XX-XXXX

In District : Rudraprayag Under Division : NH Rudraprayag

General

Bridge Type : Motor Bridge High Level
Structure No : 8
Feature Intersected : NEAR MONIKA LODGE
Name of Bridge : SYAAL SAUD BRIDGE
Nearest Town : CHANDRAPURI
Latitude (Northing) : 30.44466300
Longitude (Easting) : 79.07544600
Construction Year : 2010
Inventory Year : 2024

Geometric

Overall length (in meter) : 30.10
Total No of Span : 1
Maximuam Span (in meter) : 30.10
Span Arragment : 1*30.10
No of Lane : 2.000
Overall Width (m) : 12.500
Carriageway Width (m) : 7.600
RS Footpath Width (m) : 1.500
LS Footpath Width (m) : 1.500
Approch Width i/c Shoulders (m) : 11.000
Gradient (%age) : 0
Skew Angle (degree) : 0.00
Radius of Curve in Plan (if Any) : 0.00

Design Data

HFL Highest Flood Level :
OFL Ordinary Flood Level :
LWL Low Water Level :
Design Velocity (m/Sec) :
Design Discharge (Cumecs) :
Soffit Level at Centre :
Road Level at Centre :
Design Scour Level at Pier :
Design Scour Level at Abutments :
Exposure Condition : Moderate
Seismic Importance factor : 0.0
Design Loading : Class A
Load Rating : Class A

Super-Structure

Superstructure Type : T-beam and slab
Superstructure Material : Reinforced concrete
Wearing Coat Type : Bituminous Concrete
Expension Joint Type : Single Strip/Box Seal Joint
Railing/Crash Barrier type : Tubular steel
Bearing type : POT PIN

Sub-Structure

Founding Strata : Rocky
Abutment Foundation Type : Raft
Pier Foundation Type : NA
No of Piers : 0
Abutment Type : RCC Box type
Pier Type : NA

Protection Work

Bank Protection Left Side of Up-stream : no protection work provided
Bank Protection Right Side of Up-stream : no protection work provided
Bank Protection Left Side of Down-stream : no protection work provided
Bank Protection Right Side of Down-stream : no protection work provided
Floor Protection on Up-stream : no protection work provided
Floor Protection on Down-stream : no protection work provided
Tratment for Corrosion Protection (if any) : no special treatment provided