Bridge (ID- 1592 ) Inventory Report

स्वतंत्रता संग्राम सैनानी ”वृक्ष मानव“ श्री विश्वेश्वर दत्त सकलानी मोटर मार्ग कि0मी0 48 है0मी0 2-4 On Chainage 47.360 of Late tree man Shri Vishveshwar Dutt Saklani motor road (Raipur Kaddukhal state highway)

Data Yet Not Finalized

Last Rated On 29 Apr 2024

Rating 0.61%

Categorized As

XXXXX on XX-XX-XXXX

In District : Tehri Under Division : TD Thathyd

General

Bridge Type : Motor Bridge High Level
Structure No : 48/1
Feature Intersected : local river
Name of Bridge : स्वतंत्रता संग्राम सैनानी ”वृक्ष मानव“ श्री विश्वेश्वर दत्त सकलानी मोटर मार्ग कि0मी0 48 है0मी0 2-4
Nearest Town : marora village
Latitude (Northing) : 30.36219400
Longitude (Easting) : 78.24362800
Construction Year : 2002
Inventory Year : 2021

Geometric

Overall length (in meter) : 12.00
Total No of Span : 1
Maximuam Span (in meter) : 12.00
Span Arragment : 1x10
No of Lane : 1.000
Overall Width (m) : 5.000
Carriageway Width (m) : 4.250
RS Footpath Width (m) : 0.000
LS Footpath Width (m) : 0.000
Approch Width i/c Shoulders (m) : 7.000
Gradient (%age) : 0
Skew Angle (degree) : 0.00
Radius of Curve in Plan (if Any) : 0.00

Design Data

HFL Highest Flood Level :
OFL Ordinary Flood Level :
LWL Low Water Level :
Design Velocity (m/Sec) :
Design Discharge (Cumecs) :
Soffit Level at Centre : 3.150
Road Level at Centre : 3.750
Design Scour Level at Pier :
Design Scour Level at Abutments :
Exposure Condition : Moderate
Seismic Importance factor : 0.0
Design Loading : Class B
Load Rating : Class B

Super-Structure

Superstructure Type : Solid slab
Superstructure Material : Reinforced concrete
Wearing Coat Type : Cement Concrete
Expension Joint Type : Single Strip/Box Seal Joint
Railing/Crash Barrier type : other
Bearing type : Not Provided

Sub-Structure

Founding Strata : Sandy
Abutment Foundation Type : Open
Pier Foundation Type : NA
No of Piers : 0
Abutment Type : Stone Masonry
Pier Type : NA

Protection Work

Bank Protection Left Side of Up-stream : no protection work provided
Bank Protection Right Side of Up-stream : no protection work provided
Bank Protection Left Side of Down-stream : no protection work provided
Bank Protection Right Side of Down-stream : no protection work provided
Floor Protection on Up-stream : no protection work provided
Floor Protection on Down-stream : protected by wire crate
Tratment for Corrosion Protection (if any) : no special treatment provided