Bridge (ID- 1619 ) Inventory Report

Takoli Bagdwaldhar Motor road Bridge at Km 1.00 On Chainage 0.275 of Takoli to Bagdwaldhar motor road

Data Yet Not Finalized

Last Rated On 07 Jun 2024

Rating 3.36%

Categorized As

XXXXX on XX-XX-XXXX

In District : Tehri Under Division : TD Kirtinagar

General

Bridge Type : Motor Bridge High Level
Structure No : 1/1
Feature Intersected : Chandrabhaga Gadera
Name of Bridge : Takoli Bagdwaldhar Motor road Bridge at Km 1.00
Nearest Town : Duggada
Latitude (Northing) : 30.29614170
Longitude (Easting) : 78.69126670
Construction Year : 2017
Inventory Year : 2021

Geometric

Overall length (in meter) : 18.00
Total No of Span : 1
Maximuam Span (in meter) : 18.00
Span Arragment : 1x18 m
No of Lane : 1.000
Overall Width (m) : 4.750
Carriageway Width (m) : 4.250
RS Footpath Width (m) : 0.000
LS Footpath Width (m) : 0.000
Approch Width i/c Shoulders (m) : 6.550
Gradient (%age) : 0
Skew Angle (degree) : 0.00
Radius of Curve in Plan (if Any) : 0.00

Design Data

HFL Highest Flood Level : 797.500
OFL Ordinary Flood Level : 796.000
LWL Low Water Level : 795.500
Design Velocity (m/Sec) :
Design Discharge (Cumecs) :
Soffit Level at Centre :
Road Level at Centre : 802.500
Design Scour Level at Pier :
Design Scour Level at Abutments :
Exposure Condition : Moderate
Seismic Importance factor : 1.0
Design Loading : Class A
Load Rating : Class A

Super-Structure

Superstructure Type : Truss
Superstructure Material : Steel
Wearing Coat Type : Cement Concrete
Expension Joint Type : Single Strip/Box Seal Joint
Railing/Crash Barrier type : Steel rolled section
Bearing type : POT PIN

Sub-Structure

Founding Strata : Rocky
Abutment Foundation Type : Raft
Pier Foundation Type : NA
No of Piers : 0
Abutment Type : RCC counterfort type
Pier Type : NA

Protection Work

Bank Protection Left Side of Up-stream : Plum concrete Block
Bank Protection Right Side of Up-stream : Plum concrete Block
Bank Protection Left Side of Down-stream : Plum concrete Block
Bank Protection Right Side of Down-stream : Plum concrete Block
Floor Protection on Up-stream : no protection work provided
Floor Protection on Down-stream : no protection work provided
Tratment for Corrosion Protection (if any) : Red Oxide Primer with Synthetic enamel paint