Bridge (ID- 1620 ) Inventory Report

Koti Gujetha Motor road Bridge at Km 5.00 On Chainage 4.184 of Hisriyakhal Koti Gujetha motor road

Data Yet Not Finalized

Last Rated On 12 Jun 2024

Rating 3.62%

Categorized As

XXXXX on XX-XX-XXXX

In District : Tehri Under Division : TD Kirtinagar

General

Bridge Type : Motor Bridge High Level
Structure No : 1/1
Feature Intersected : Gujetha Gadh
Name of Bridge : Koti Gujetha Motor road Bridge at Km 5.00
Nearest Town : Kirtinagar
Latitude (Northing) : 30.27472210
Longitude (Easting) : 78.66027777
Construction Year : 2018
Inventory Year : 2021

Geometric

Overall length (in meter) : 18.00
Total No of Span : 1
Maximuam Span (in meter) : 18.00
Span Arragment : 1x18
No of Lane : 1.000
Overall Width (m) : 4.750
Carriageway Width (m) : 4.250
RS Footpath Width (m) : 0.000
LS Footpath Width (m) : 0.000
Approch Width i/c Shoulders (m) : 6.550
Gradient (%age) : 0
Skew Angle (degree) : 0.00
Radius of Curve in Plan (if Any) : 0.00

Design Data

HFL Highest Flood Level :
OFL Ordinary Flood Level :
LWL Low Water Level :
Design Velocity (m/Sec) :
Design Discharge (Cumecs) : 0.00
Soffit Level at Centre :
Road Level at Centre :
Design Scour Level at Pier :
Design Scour Level at Abutments :
Exposure Condition : Moderate
Seismic Importance factor : 1.0
Design Loading : Class A
Load Rating : Class A

Super-Structure

Superstructure Type : Truss
Superstructure Material : Reinforced concrete
Wearing Coat Type : Cement Concrete
Expension Joint Type : Single Strip/Box Seal Joint
Railing/Crash Barrier type : Steel rolled section
Bearing type : POT PIN

Sub-Structure

Founding Strata : Hard clayey
Abutment Foundation Type : Raft
Pier Foundation Type : NA
No of Piers : 0
Abutment Type : RCC counterfort type
Pier Type : NA

Protection Work

Bank Protection Left Side of Up-stream : Plum concrete Block
Bank Protection Right Side of Up-stream : Plum concrete Block
Bank Protection Left Side of Down-stream : Plum concrete Block
Bank Protection Right Side of Down-stream : Plum concrete Block
Floor Protection on Up-stream : no protection work provided
Floor Protection on Down-stream : no protection work provided
Tratment for Corrosion Protection (if any) : Red Oxide Primer with Synthetic enamel paint