Bridge (ID- 1659 ) Inventory Report

Local Nala On Chainage 0.500 of Govindpur to hidimba devi mandir road

Data finalized On 19 Jun 2025

By Kishor Singh Patwal

Last Rated On 19 Jun 2025

Rating 0.00%

Categorized As

XXXXX on XX-XX-XXXX

In District : Udham Singh Nagar Under Division : CD Kashipur

General

Bridge Type : Motor Bridge High Level
Structure No : 6/7
Feature Intersected : Local Nala
Name of Bridge : Local Nala
Nearest Town : Jaspur
Latitude (Northing) : 29.01441000
Longitude (Easting) : 78.05145000
Construction Year : 2008
Inventory Year : 2020

Geometric

Overall length (in meter) : 9.69
Total No of Span : 1
Maximuam Span (in meter) : 9.69
Span Arragment : 1x9.69
No of Lane : 1.000
Overall Width (m) : 7.500
Carriageway Width (m) : 9.000
RS Footpath Width (m) : 0.000
LS Footpath Width (m) : 0.000
Approch Width i/c Shoulders (m) : 7.500
Gradient (%age) : 0
Skew Angle (degree) : 0.00
Radius of Curve in Plan (if Any) : 0.00

Design Data

HFL Highest Flood Level :
OFL Ordinary Flood Level :
LWL Low Water Level :
Design Velocity (m/Sec) :
Design Discharge (Cumecs) :
Soffit Level at Centre :
Road Level at Centre :
Design Scour Level at Pier :
Design Scour Level at Abutments :
Exposure Condition : Moderate
Seismic Importance factor : 1.0
Design Loading : Class A
Load Rating : Class A

Super-Structure

Superstructure Type : Solid slab
Superstructure Material : Reinforced concrete
Wearing Coat Type : Cement Concrete
Expension Joint Type : Not Provided
Railing/Crash Barrier type : Not Provided
Bearing type : Not Provided

Sub-Structure

Founding Strata : Sandy
Abutment Foundation Type : other
Pier Foundation Type : NA
No of Piers : 0
Abutment Type : Brick Masonry
Pier Type : NA

Protection Work

Bank Protection Left Side of Up-stream : no protection work provided
Bank Protection Right Side of Up-stream : no protection work provided
Bank Protection Left Side of Down-stream : no protection work provided
Bank Protection Right Side of Down-stream : no protection work provided
Floor Protection on Up-stream : no protection work provided
Floor Protection on Down-stream : no protection work provided
Tratment for Corrosion Protection (if any) : no special treatment provided