Bridge (ID- 1684 ) Inventory Report

Khalduwa over Mashangari River On Chainage 1.900 of Deghat Khalduwa Motor Road

Data finalized On 25 Apr 2022

By Gulam Mohamad

Last Rated On 16 May 2024

Rating 0.00%

Categorized As

XXXXX on XX-XX-XXXX

In District : Almora Under Division : PD Ranikhet

General

Bridge Type : Motor Bridge High Level
Structure No : 2/5
Feature Intersected : Mashangari River
Name of Bridge : Khalduwa over Mashangari River
Nearest Town : Ganga Nagar
Latitude (Northing) : 29.91238900
Longitude (Easting) : 79.23108300
Construction Year : 2010
Inventory Year : 2012

Geometric

Overall length (in meter) : 48.00
Total No of Span : 1
Maximuam Span (in meter) : 49.00
Span Arragment : 1x48
No of Lane : 1.000
Overall Width (m) : 4.270
Carriageway Width (m) : 4.250
RS Footpath Width (m) : 0.000
LS Footpath Width (m) : 0.000
Approch Width i/c Shoulders (m) : 6.000
Gradient (%age) : 0
Skew Angle (degree) : 0.00
Radius of Curve in Plan (if Any) : 0.00

Design Data

HFL Highest Flood Level :
OFL Ordinary Flood Level :
LWL Low Water Level : 100.500
Design Velocity (m/Sec) :
Design Discharge (Cumecs) :
Soffit Level at Centre :
Road Level at Centre :
Design Scour Level at Pier :
Design Scour Level at Abutments :
Exposure Condition : Moderate
Seismic Importance factor : 1.0
Design Loading : Class B
Load Rating : Class B

Super-Structure

Superstructure Type : Solid slab
Superstructure Material : Reinforced concrete
Wearing Coat Type : Cement Concrete
Expension Joint Type : Not Provided
Railing/Crash Barrier type : Tubular steel
Bearing type : Roller & Rocker

Sub-Structure

Founding Strata : Rocky
Abutment Foundation Type : Open
Pier Foundation Type : NA
No of Piers : 0
Abutment Type : Stone Masonry
Pier Type : NA

Protection Work

Bank Protection Left Side of Up-stream : 5m wing wall RR stone masonary
Bank Protection Right Side of Up-stream : 5m wing wall RR stone masonary
Bank Protection Left Side of Down-stream : 5m wing wall RR stone masonary
Bank Protection Right Side of Down-stream : 5m wing wall RR stone masonary
Floor Protection on Up-stream : no protection work provided
Floor Protection on Down-stream : no protection work provided
Tratment for Corrosion Protection (if any) : no special treatment provided