Bridge (ID- 1742 ) Inventory Report

RCC motor Bridge On Chainage 71.500 of Tehri Hindolakhal Devprayag Vyasghat Bilkhet state highway

Data Yet Not Finalized

Last Rated On 28 Nov 2024

Rating 0.00%

Categorized As

XXXXX on XX-XX-XXXX

In District : Pauri Under Division : PD Pauri

General

Bridge Type : Motor Bridge High Level
Structure No : 72/1
Feature Intersected : Vyaschatti Naugaun Gadera
Name of Bridge : RCC motor Bridge
Nearest Town : Vyaschatti
Latitude (Northing) : 30.06432000
Longitude (Easting) : 78.60361000
Construction Year : 2008
Inventory Year : 2022

Geometric

Overall length (in meter) : 11.40
Total No of Span : 1
Maximuam Span (in meter) : 11.40
Span Arragment : 1x13.00
No of Lane : 1.000
Overall Width (m) : 6.000
Carriageway Width (m) : 5.450
RS Footpath Width (m) : 0.000
LS Footpath Width (m) : 0.000
Approch Width i/c Shoulders (m) : 5.000
Gradient (%age) : 0
Skew Angle (degree) : 0.00
Radius of Curve in Plan (if Any) : 0.00

Design Data

HFL Highest Flood Level : 462.000
OFL Ordinary Flood Level : 460.000
LWL Low Water Level : 458.000
Design Velocity (m/Sec) :
Design Discharge (Cumecs) :
Soffit Level at Centre : 464.750
Road Level at Centre : 465.000
Design Scour Level at Pier :
Design Scour Level at Abutments : 456.000
Exposure Condition : Moderate
Seismic Importance factor : 1.0
Design Loading : Class B
Load Rating : Class B

Super-Structure

Superstructure Type : T-beam and slab
Superstructure Material : Reinforced concrete
Wearing Coat Type : Cement Concrete
Expension Joint Type : Not Provided
Railing/Crash Barrier type : Tubular steel
Bearing type : Not Provided

Sub-Structure

Founding Strata : Bouldery
Abutment Foundation Type : Open
Pier Foundation Type : NA
No of Piers : 0
Abutment Type : Stone Masonry
Pier Type : NA

Protection Work

Bank Protection Left Side of Up-stream : no protection work provided
Bank Protection Right Side of Up-stream : no protection work provided
Bank Protection Left Side of Down-stream : no protection work provided
Bank Protection Right Side of Down-stream : no protection work provided
Floor Protection on Up-stream : no protection work provided
Floor Protection on Down-stream : no protection work provided
Tratment for Corrosion Protection (if any) : no special treatment provided