Bridge (ID- 1745 ) Inventory Report

RCC motor Bridge On Chainage 80.500 of Tehri Hindolakhal Devprayag Vyasghat Bilkhet state highway

Data finalized On 26 Nov 2022

By Er. Mahendra Singh Dawan

Last Rated On 28 Nov 2024

Rating 0.00%

Categorized As

XXXXX on XX-XX-XXXX

In District : Pauri Under Division : PD Pauri

General

Bridge Type : Motor Bridge High Level
Structure No : 81/1
Feature Intersected : Thangarh Gadera
Name of Bridge : RCC motor Bridge
Nearest Town : Chopra
Latitude (Northing) : 30.02142000
Longitude (Easting) : 78.63487000
Construction Year : 2010
Inventory Year : 2022

Geometric

Overall length (in meter) : 12.50
Total No of Span : 1
Maximuam Span (in meter) : 12.50
Span Arragment : 1x12.50
No of Lane : 1.000
Overall Width (m) : 7.500
Carriageway Width (m) : 6.000
RS Footpath Width (m) : 0.000
LS Footpath Width (m) : 0.000
Approch Width i/c Shoulders (m) : 7.500
Gradient (%age) : 0
Skew Angle (degree) : 0.00
Radius of Curve in Plan (if Any) : 0.00

Design Data

HFL Highest Flood Level : 559.500
OFL Ordinary Flood Level : 556.000
LWL Low Water Level : 553.500
Design Velocity (m/Sec) :
Design Discharge (Cumecs) :
Soffit Level at Centre : 560.550
Road Level at Centre : 562.000
Design Scour Level at Pier :
Design Scour Level at Abutments : 552.000
Exposure Condition : Moderate
Seismic Importance factor : 1.0
Design Loading : Class B
Load Rating : Class B

Super-Structure

Superstructure Type : Arch
Superstructure Material : Reinforced concrete
Wearing Coat Type : Bituminous Concrete
Expension Joint Type : Not Provided
Railing/Crash Barrier type : other
Bearing type : Not Provided

Sub-Structure

Founding Strata : Rocky
Abutment Foundation Type : Open
Pier Foundation Type : NA
No of Piers : 0
Abutment Type : Stone Masonry
Pier Type : NA

Protection Work

Bank Protection Left Side of Up-stream : no protection work provided
Bank Protection Right Side of Up-stream : no protection work provided
Bank Protection Left Side of Down-stream : no protection work provided
Bank Protection Right Side of Down-stream : no protection work provided
Floor Protection on Up-stream : no protection work provided
Floor Protection on Down-stream : no protection work provided
Tratment for Corrosion Protection (if any) : no special treatment provided