Bridge (ID- 1746 ) Inventory Report

Suspension Bridge On Chainage 83.300 of Tehri Hindolakhal Devprayag Vyasghat Bilkhet state highway

Data finalized On 26 Nov 2022

By Er. Mahendra Singh Dawan

Last Rated On 14 May 2024

Rating 0.00%

Categorized As

XXXXX on XX-XX-XXXX

In District : Pauri Under Division : PD Pauri

General

Bridge Type : Pedestrain Bridge
Structure No : 84/1
Feature Intersected : Nayar River
Name of Bridge : Suspension Bridge
Nearest Town : Badiyun Market
Latitude (Northing) : 30.00260000
Longitude (Easting) : 78.63322000
Construction Year : 2010
Inventory Year : 2022

Geometric

Overall length (in meter) : 55.60
Total No of Span : 1
Maximuam Span (in meter) : 55.60
Span Arragment : 1x55.60
No of Lane : 1.000
Overall Width (m) : 1.800
Carriageway Width (m) : 1.800
RS Footpath Width (m) : 0.000
LS Footpath Width (m) : 0.000
Approch Width i/c Shoulders (m) : 2.500
Gradient (%age) : 0
Skew Angle (degree) : 0.00
Radius of Curve in Plan (if Any) : 0.00

Design Data

HFL Highest Flood Level : 489.000
OFL Ordinary Flood Level : 486.000
LWL Low Water Level : 482.000
Design Velocity (m/Sec) :
Design Discharge (Cumecs) :
Soffit Level at Centre : 494.970
Road Level at Centre : 495.000
Design Scour Level at Pier :
Design Scour Level at Abutments : 491.000
Exposure Condition : Moderate
Seismic Importance factor : 1.0
Design Loading : Footpath Live Load
Load Rating : Footpath Live Load

Super-Structure

Superstructure Type : Suspension
Superstructure Material : Steel
Wearing Coat Type : Bituminous Concrete
Expension Joint Type : Not Provided
Railing/Crash Barrier type : Tubular steel
Bearing type : Not Provided

Sub-Structure

Founding Strata : Rocky
Abutment Foundation Type : Open
Pier Foundation Type : NA
No of Piers : 0
Abutment Type : Stone Masonry
Pier Type : NA

Protection Work

Bank Protection Left Side of Up-stream : no protection work provided
Bank Protection Right Side of Up-stream : no protection work provided
Bank Protection Left Side of Down-stream : no protection work provided
Bank Protection Right Side of Down-stream : no protection work provided
Floor Protection on Up-stream : no protection work provided
Floor Protection on Down-stream : no protection work provided
Tratment for Corrosion Protection (if any) : no special treatment provided