Bridge (ID- 1749 ) Inventory Report

RCC motor Bridge On Chainage 89.500 of Tehri Hindolakhal Devprayag Vyasghat Bilkhet state highway

Data finalized On 26 Nov 2022

By Er. Mahendra Singh Dawan

Last Rated On 17 May 2024

Rating 2.76%

Categorized As

XXXXX on XX-XX-XXXX

In District : Pauri Under Division : PD Pauri

General

Bridge Type : Motor Bridge High Level
Structure No : 90/1
Feature Intersected : Local Gadera
Name of Bridge : RCC motor Bridge
Nearest Town : Sangura (Bhuvneshwari Temple)
Latitude (Northing) : 29.96881000
Longitude (Easting) : 78.67387000
Construction Year : 2012
Inventory Year : 2022

Geometric

Overall length (in meter) : 8.50
Total No of Span : 1
Maximuam Span (in meter) : 8.50
Span Arragment : 1x8.50
No of Lane : 1.000
Overall Width (m) : 4.000
Carriageway Width (m) : 3.750
RS Footpath Width (m) : 0.000
LS Footpath Width (m) : 0.000
Approch Width i/c Shoulders (m) : 6.000
Gradient (%age) : 0
Skew Angle (degree) : 0.00
Radius of Curve in Plan (if Any) : 0.00

Design Data

HFL Highest Flood Level : 574.300
OFL Ordinary Flood Level : 571.000
LWL Low Water Level : 569.300
Design Velocity (m/Sec) :
Design Discharge (Cumecs) :
Soffit Level at Centre : 575.700
Road Level at Centre : 576.000
Design Scour Level at Pier :
Design Scour Level at Abutments : 568.000
Exposure Condition : Very Severe
Seismic Importance factor : 1.0
Design Loading : Class B
Load Rating : Class B

Super-Structure

Superstructure Type : Solid slab
Superstructure Material : Reinforced concrete
Wearing Coat Type : Cement Concrete
Expension Joint Type : Not Provided
Railing/Crash Barrier type : Tubular steel
Bearing type : Not Provided

Sub-Structure

Founding Strata : Rocky
Abutment Foundation Type : Open
Pier Foundation Type : NA
No of Piers : 0
Abutment Type : Stone Masonry
Pier Type : NA

Protection Work

Bank Protection Left Side of Up-stream : no protection work provided
Bank Protection Right Side of Up-stream : no protection work provided
Bank Protection Left Side of Down-stream : no protection work provided
Bank Protection Right Side of Down-stream : no protection work provided
Floor Protection on Up-stream : no protection work provided
Floor Protection on Down-stream : no protection work provided
Tratment for Corrosion Protection (if any) : no special treatment provided