Bridge (ID- 1751 ) Inventory Report

Koti Raulyalu Ki To Bor goan Motor Road km 2.00 (13.70 mtr) On Chainage 1.490 of Koti Raulyalu ki to Bor Gaon Motor Road.

Data finalized On 17 Dec 2022

By BRIJESH RANA

Last Rated On 15 May 2024

Rating 0.00%

Categorized As

XXXXX on XX-XX-XXXX

In District : Tehri Under Division : CD Chamba

General

Bridge Type : Motor Bridge High Level
Structure No : 2/1
Feature Intersected : Ratnaungad
Name of Bridge : Koti Raulyalu Ki To Bor goan Motor Road km 2.00 (13.70 mtr)
Nearest Town : koti
Latitude (Northing) : 30.43258889
Longitude (Easting) : 78.37244722
Construction Year : 2021
Inventory Year : 2022

Geometric

Overall length (in meter) : 13.70
Total No of Span : 1
Maximuam Span (in meter) : 13.70
Span Arragment : 1x13.70
No of Lane : 1.000
Overall Width (m) : 6.000
Carriageway Width (m) : 6.000
RS Footpath Width (m) : 0.000
LS Footpath Width (m) : 0.000
Approch Width i/c Shoulders (m) : 6.000
Gradient (%age) : 0
Skew Angle (degree) : 0.00
Radius of Curve in Plan (if Any) : 0.00

Design Data

HFL Highest Flood Level :
OFL Ordinary Flood Level :
LWL Low Water Level :
Design Velocity (m/Sec) :
Design Discharge (Cumecs) :
Soffit Level at Centre :
Road Level at Centre :
Design Scour Level at Pier :
Design Scour Level at Abutments :
Exposure Condition : Moderate
Seismic Importance factor : 1.0
Design Loading : Class A
Load Rating : Class A

Super-Structure

Superstructure Type : Box girder
Superstructure Material : Reinforced concrete
Wearing Coat Type : Cement Concrete
Expension Joint Type : Not Provided
Railing/Crash Barrier type : Tubular steel
Bearing type : Not Provided

Sub-Structure

Founding Strata : Rocky
Abutment Foundation Type : Open
Pier Foundation Type : NA
No of Piers : 0
Abutment Type : other
Pier Type : NA

Protection Work

Bank Protection Left Side of Up-stream : no protection work provided
Bank Protection Right Side of Up-stream : no protection work provided
Bank Protection Left Side of Down-stream : no protection work provided
Bank Protection Right Side of Down-stream : no protection work provided
Floor Protection on Up-stream : no protection work provided
Floor Protection on Down-stream : no protection work provided
Tratment for Corrosion Protection (if any) : no special treatment provided