Bridge (ID- 1774 ) Inventory Report

Paththarkot Bridge On Chainage 0.025 of Village Gawapani to Pattharkot Motor From Kosi-Daulaghat Motor Road

Data finalized On 17 Aug 2022

By P.C. Pant

Last Rated On 28 May 2024

Rating 0.35%

Categorized As

XXXXX on XX-XX-XXXX

In District : Almora Under Division : PD Almora

General

Bridge Type : Motor Bridge High Level
Structure No : 1/1
Feature Intersected : Chhoti Kosi River
Name of Bridge : Paththarkot Bridge
Nearest Town : Gewapani
Latitude (Northing) : 29.66022600
Longitude (Easting) : 79.59465200
Construction Year : 2008
Inventory Year : 2022

Geometric

Overall length (in meter) : 15.50
Total No of Span : 1
Maximuam Span (in meter) : 15.00
Span Arragment : 1x15m
No of Lane : 1.000
Overall Width (m) : 5.150
Carriageway Width (m) : 4.350
RS Footpath Width (m) : 0.000
LS Footpath Width (m) : 0.000
Approch Width i/c Shoulders (m) : 6.750
Gradient (%age) : 0
Skew Angle (degree) : 0.00
Radius of Curve in Plan (if Any) : 0.00

Design Data

HFL Highest Flood Level :
OFL Ordinary Flood Level :
LWL Low Water Level :
Design Velocity (m/Sec) :
Design Discharge (Cumecs) :
Soffit Level at Centre :
Road Level at Centre :
Design Scour Level at Pier : 0.000
Design Scour Level at Abutments :
Exposure Condition : Moderate
Seismic Importance factor : 0.0
Design Loading : NA
Load Rating : NA

Super-Structure

Superstructure Type : T-beam and slab
Superstructure Material : Reinforced concrete
Wearing Coat Type : Cement Concrete
Expension Joint Type : Single Strip/Box Seal Joint
Railing/Crash Barrier type : Cast-in-situ concrete
Bearing type : Not Provided

Sub-Structure

Founding Strata : Rocky
Abutment Foundation Type : Open
Pier Foundation Type : NA
No of Piers : 0
Abutment Type : Stone Masonry
Pier Type : NA

Protection Work

Bank Protection Left Side of Up-stream : no protection work provided
Bank Protection Right Side of Up-stream : no protection work provided
Bank Protection Left Side of Down-stream : no protection work provided
Bank Protection Right Side of Down-stream : no protection work provided
Floor Protection on Up-stream : no protection work provided
Floor Protection on Down-stream : no protection work provided
Tratment for Corrosion Protection (if any) : no special treatment provided