Bridge (ID- 179 ) Inventory Report

khanad bridge On Chainage 16.575 of Chakrata Lakhamandal Barnigad state highway

Data finalized On 23 Dec 2022

By Er .Amit sharma

Last Rated On 01 Jun 2024

Rating 0.00%

Categorized As

XXXXX on XX-XX-XXXX

In District : Dehradun Under Division : TD Chakrata

General

Bridge Type : Motor Bridge High Level
Structure No : 23/1
Feature Intersected : khanad khad
Name of Bridge : khanad bridge
Nearest Town : khanad
Latitude (Northing) : 30.71118333
Longitude (Easting) : 77.90757200
Construction Year :
Inventory Year : 2020

Geometric

Overall length (in meter) : 13.50
Total No of Span : 1
Maximuam Span (in meter) : 13.50
Span Arragment : 1x13.50
No of Lane : 1.000
Overall Width (m) : 7.500
Carriageway Width (m) : 4.250
RS Footpath Width (m) : 0.000
LS Footpath Width (m) : 0.000
Approch Width i/c Shoulders (m) : 6.000
Gradient (%age) : 0
Skew Angle (degree) : 0.00
Radius of Curve in Plan (if Any) : 0.00

Design Data

HFL Highest Flood Level :
OFL Ordinary Flood Level :
LWL Low Water Level :
Design Velocity (m/Sec) :
Design Discharge (Cumecs) :
Soffit Level at Centre :
Road Level at Centre :
Design Scour Level at Pier :
Design Scour Level at Abutments :
Exposure Condition : Moderate
Seismic Importance factor : 1.0
Design Loading : Class B
Load Rating : Class B

Super-Structure

Superstructure Type : T-beam and slab
Superstructure Material : Reinforced concrete
Wearing Coat Type : Cement Concrete
Expension Joint Type : Single Strip/Box Seal Joint
Railing/Crash Barrier type : Tubular steel
Bearing type : Not Provided

Sub-Structure

Founding Strata : Rocky
Abutment Foundation Type : Open
Pier Foundation Type : NA
No of Piers : 0
Abutment Type : Stone Masonry
Pier Type : NA

Protection Work

Bank Protection Left Side of Up-stream : no protection work provided
Bank Protection Right Side of Up-stream : no protection work provided
Bank Protection Left Side of Down-stream : no protection work provided
Bank Protection Right Side of Down-stream : no protection work provided
Floor Protection on Up-stream : no protection work provided
Floor Protection on Down-stream : no protection work provided
Tratment for Corrosion Protection (if any) : no special treatment provided