Bridge (ID- 182 ) Inventory Report

Anu-Chilhar Motor Bridge On Chainage 1.975 of Anu to Chilhad motor road (Tons bridge approach road)

Data finalized On 23 Dec 2022

By Er.Naresh sharma

Last Rated On 09 Oct 2024

Rating 0.12%

Categorized As

XXXXX on XX-XX-XXXX

In District : Dehradun Under Division : TD Chakrata

General

Bridge Type : Motor Bridge High Level
Structure No : 1/3
Feature Intersected : Tons River
Name of Bridge : Anu-Chilhar Motor Bridge
Nearest Town : Alsi Village
Latitude (Northing) : 30.86665500
Longitude (Easting) : 77.81802100
Construction Year :
Inventory Year : 2022

Geometric

Overall length (in meter) : 65.00
Total No of Span : 1
Maximuam Span (in meter) : 65.00
Span Arragment : 1x65
No of Lane : 1.000
Overall Width (m) : 4.750
Carriageway Width (m) : 4.600
RS Footpath Width (m) : 0.000
LS Footpath Width (m) : 0.000
Approch Width i/c Shoulders (m) : 6.000
Gradient (%age) : 3
Skew Angle (degree) : 0.00
Radius of Curve in Plan (if Any) : 0.00

Design Data

HFL Highest Flood Level :
OFL Ordinary Flood Level :
LWL Low Water Level :
Design Velocity (m/Sec) :
Design Discharge (Cumecs) :
Soffit Level at Centre :
Road Level at Centre :
Design Scour Level at Pier :
Design Scour Level at Abutments :
Exposure Condition : Moderate
Seismic Importance factor : 1.0
Design Loading : Class B
Load Rating : Class B

Super-Structure

Superstructure Type : Truss
Superstructure Material : Reinforced concrete
Wearing Coat Type : Cement Concrete
Expension Joint Type : Reinforced Elastomeric Joint
Railing/Crash Barrier type : Steel rolled section
Bearing type : POT PIN

Sub-Structure

Founding Strata : Rocky
Abutment Foundation Type : Open
Pier Foundation Type : NA
No of Piers : 0
Abutment Type : Stone Masonry
Pier Type : NA

Protection Work

Bank Protection Left Side of Up-stream : no protection work provided
Bank Protection Right Side of Up-stream : no protection work provided
Bank Protection Left Side of Down-stream : no protection work provided
Bank Protection Right Side of Down-stream : no protection work provided
Floor Protection on Up-stream : no protection work provided
Floor Protection on Down-stream : no protection work provided
Tratment for Corrosion Protection (if any) : no special treatment provided