Bridge (ID- 1824 ) Inventory Report

36 Mtr Span Bridle Bridge at Lahur Barmati Gadhera

Data finalized On 09 Aug 2022

By Er. Govind Singh Mahara

Last Rated On 10 Nov 2023

Rating 0.00%

Categorized As

XXXXX on XX-XX-XXXX

In District : Bageshwar Under Division : CD Kapkot

General

Bridge Type : Pedestrain Bridge
Structure No : 1/1
Feature Intersected : Barmati Gadhera
Name of Bridge : 36 Mtr Span Bridle Bridge at Lahur Barmati Gadhera
Nearest Town : Lahur
Latitude (Northing) : 30.04989444
Longitude (Easting) : 79.98061944
Construction Year : 2019
Inventory Year : 2020

Geometric

Overall length (in meter) : 36.00
Total No of Span : 1
Maximuam Span (in meter) : 36.00
Span Arragment : 1x36
No of Lane : 1.000
Overall Width (m) : 1.800
Carriageway Width (m) : 1.800
RS Footpath Width (m) : 0.000
LS Footpath Width (m) : 0.000
Approch Width i/c Shoulders (m) : 2.000
Gradient (%age) : 0
Skew Angle (degree) : 0.00
Radius of Curve in Plan (if Any) : 0.00

Design Data

HFL Highest Flood Level : 2202.000
OFL Ordinary Flood Level : 2200.400
LWL Low Water Level : 2200.000
Design Velocity (m/Sec) : 7.00
Design Discharge (Cumecs) : 750.00
Soffit Level at Centre : 2204.500
Road Level at Centre : 2005.000
Design Scour Level at Pier :
Design Scour Level at Abutments :
Exposure Condition : Moderate
Seismic Importance factor : 1.0
Design Loading : Footpath Live Load
Load Rating : Footpath Live Load

Super-Structure

Superstructure Type : Truss
Superstructure Material : Steel
Wearing Coat Type : Other
Expension Joint Type : Not Provided
Railing/Crash Barrier type : Steel rolled section
Bearing type : Roller & Rocker

Sub-Structure

Founding Strata : Bouldery
Abutment Foundation Type : Raft
Pier Foundation Type : NA
No of Piers : 0
Abutment Type : Stone Masonry
Pier Type : NA

Protection Work

Bank Protection Left Side of Up-stream : Plume Concrete Block
Bank Protection Right Side of Up-stream : p
Bank Protection Left Side of Down-stream : no protection work provided
Bank Protection Right Side of Down-stream : no protection work provided
Floor Protection on Up-stream : no protection work provided
Floor Protection on Down-stream : no protection work provided
Tratment for Corrosion Protection (if any) : no special treatment provided