Data finalized On 20 Aug 2022
By Er. Pankaj Patwa
Last Rated On 10 Jun 2024
Rating 0.00%
Categorized As
XXXXX on XX-XX-XXXX
In District : Bageshwar Under Division : CD Kapkot
General
Bridge Type :
Pedestrain Bridge
Structure No :
1/1
Feature Intersected :
Ramganga River
Name of Bridge :
110 Mtr Span Ramgamga Pedestrian Bridge
Nearest Town :
Ramadi
Latitude (Northing) :
29.09493260
Longitude (Easting) :
80.12602100
Construction Year :
2021
Inventory Year :
2021
Geometric
Overall length (in meter) :
110.00
Total No of Span :
1
Maximuam Span (in meter) :
110.00
Span Arragment :
1x110
No of Lane :
1.000
Overall Width (m) :
1.800
Carriageway Width (m) :
1.800
RS Footpath Width (m) :
0.000
LS Footpath Width (m) :
0.000
Approch Width i/c Shoulders (m) :
1.800
Gradient (%age) :
0
Skew Angle (degree) :
0.00
Radius of Curve in Plan (if Any) :
0.00
Design Data
HFL Highest Flood Level :
1102.500
OFL Ordinary Flood Level :
1101.000
LWL Low Water Level :
1100.000
Design Velocity (m/Sec) :
7.00
Design Discharge (Cumecs) :
2500.00
Soffit Level at Centre :
1109.500
Road Level at Centre :
1110.000
Design Scour Level at Pier :
Design Scour Level at Abutments :
Exposure Condition :
Moderate
Seismic Importance factor :
1.0
Design Loading :
Footpath Live Load
Load Rating :
Footpath Live Load
Super-Structure
Superstructure Type :
Suspension
Superstructure Material :
Steel
Wearing Coat Type :
Other
Expension Joint Type :
Not Provided
Railing/Crash Barrier type :
Steel rolled section
Bearing type :
other
Sub-Structure
Founding Strata :
Bouldery
Abutment Foundation Type :
Raft
Pier Foundation Type :
NA
No of Piers :
0
Abutment Type :
RCC Box type
Pier Type :
NA
Protection Work
Bank Protection Left Side of Up-stream :
Plum Concrete Block
Bank Protection Right Side of Up-stream :
Plum Concrete Block
Bank Protection Left Side of Down-stream :
no protection work provided
Bank Protection Right Side of Down-stream :
no protection work provided
Floor Protection on Up-stream :
no protection work provided
Floor Protection on Down-stream :
no protection work provided
Tratment for Corrosion Protection (if any) :
no special treatment provided