Bridge (ID- 1833 ) Inventory Report

71m Span bridle bridge On Chainage 0.160 of Bilona brdle bridge approach road over river Saryu

Data Yet Not Finalized

Last Rated On 30 Jun 2024

Rating 0.78%

Categorized As

XXXXX on XX-XX-XXXX

In District : Bageshwar Under Division : PD Bageshwar

General

Bridge Type : Foot Over Bridge
Structure No : 1/1
Feature Intersected : Saryu River
Name of Bridge : 71m Span bridle bridge
Nearest Town : Bageshwar
Latitude (Northing) : 29.81830000
Longitude (Easting) : 79.77678200
Construction Year : 1988
Inventory Year : 2022

Geometric

Overall length (in meter) : 71.00
Total No of Span : 1
Maximuam Span (in meter) : 71.00
Span Arragment : 1x71m
No of Lane : 1.000
Overall Width (m) : 1.800
Carriageway Width (m) : 1.800
RS Footpath Width (m) : 0.000
LS Footpath Width (m) : 0.000
Approch Width i/c Shoulders (m) : 1.800
Gradient (%age) : 1
Skew Angle (degree) : 0.00
Radius of Curve in Plan (if Any) : 0.00

Design Data

HFL Highest Flood Level :
OFL Ordinary Flood Level :
LWL Low Water Level :
Design Velocity (m/Sec) :
Design Discharge (Cumecs) :
Soffit Level at Centre :
Road Level at Centre :
Design Scour Level at Pier :
Design Scour Level at Abutments :
Exposure Condition : Moderate
Seismic Importance factor : 1.0
Design Loading : Footpath Live Load
Load Rating : Footpath Live Load

Super-Structure

Superstructure Type : T-beam and slab
Superstructure Material : Reinforced concrete
Wearing Coat Type : Cement Concrete
Expension Joint Type : Single Strip/Box Seal Joint
Railing/Crash Barrier type : Tubular steel
Bearing type : POT PIN

Sub-Structure

Founding Strata : Rocky
Abutment Foundation Type : Open
Pier Foundation Type : Well
No of Piers : 0
Abutment Type : Stone Masonry
Pier Type : RCC Solid

Protection Work

Bank Protection Left Side of Up-stream : no protection work provided
Bank Protection Right Side of Up-stream : no protection work provided
Bank Protection Left Side of Down-stream : no protection work provided
Bank Protection Right Side of Down-stream : no protection work provided
Floor Protection on Up-stream : no protection work provided
Floor Protection on Down-stream : no protection work provided
Tratment for Corrosion Protection (if any) : no special treatment provided