Bridge (ID- 1834 ) Inventory Report

84m Span motor bridge Bilona On Chainage 6.625 of Ring Road (Bagirathi-Mandalsera Aare Section)

Data finalized On 27 Sep 2022

By Minakshi Pant

Last Rated On 18 Nov 2023

Rating 0.38%

Categorized As

XXXXX on XX-XX-XXXX

In District : Bageshwar Under Division : PD Bageshwar

General

Bridge Type : Motor Bridge High Level
Structure No : 1/1
Feature Intersected : Saryu River
Name of Bridge : 84m Span motor bridge Bilona
Nearest Town : Bageshwar
Latitude (Northing) : 29.82217700
Longitude (Easting) : 79.77325200
Construction Year : 2017
Inventory Year : 2022

Geometric

Overall length (in meter) : 84.00
Total No of Span : 1
Maximuam Span (in meter) : 84.00
Span Arragment : 1x84m
No of Lane : 1.000
Overall Width (m) : 6.100
Carriageway Width (m) : 5.500
RS Footpath Width (m) : 0.000
LS Footpath Width (m) : 0.000
Approch Width i/c Shoulders (m) : 6.500
Gradient (%age) : 1
Skew Angle (degree) : 0.00
Radius of Curve in Plan (if Any) : 0.00

Design Data

HFL Highest Flood Level : 852.000
OFL Ordinary Flood Level : 851.000
LWL Low Water Level : 850.000
Design Velocity (m/Sec) :
Design Discharge (Cumecs) :
Soffit Level at Centre :
Road Level at Centre :
Design Scour Level at Pier :
Design Scour Level at Abutments :
Exposure Condition : Moderate
Seismic Importance factor : 0.0
Design Loading : Class A
Load Rating : Class A

Super-Structure

Superstructure Type : Truss
Superstructure Material : Steel
Wearing Coat Type : Cement Concrete
Expension Joint Type : Other
Railing/Crash Barrier type : Steel rolled section
Bearing type : POT PIN

Sub-Structure

Founding Strata : Rocky
Abutment Foundation Type : Open
Pier Foundation Type : NA
No of Piers : 0
Abutment Type : Stone Masonry
Pier Type : NA

Protection Work

Bank Protection Left Side of Up-stream : no protection work provided
Bank Protection Right Side of Up-stream : no protection work provided
Bank Protection Left Side of Down-stream : no protection work provided
Bank Protection Right Side of Down-stream : no protection work provided
Floor Protection on Up-stream : no protection work provided
Floor Protection on Down-stream : no protection work provided
Tratment for Corrosion Protection (if any) : no special treatment provided