Data finalized On 01 Sep 2022
By Er. Pankaj Patwa
Last Rated On 25 May 2024
Rating 2.35%
Categorized As
XXXXX on XX-XX-XXXX
In District : Bageshwar Under Division : CD Kapkot
General
Bridge Type :
Pedestrain Bridge
Structure No :
1/1
Feature Intersected :
Ramganga River
Name of Bridge :
70 Mtr Span suspension Bridge Tejam at Ramganga River
Nearest Town :
Tejam
Latitude (Northing) :
29.94935000
Longitude (Easting) :
80.12609000
Construction Year :
1992
Inventory Year :
2010
Geometric
Overall length (in meter) :
70.00
Total No of Span :
1
Maximuam Span (in meter) :
70.00
Span Arragment :
70.00
No of Lane :
1.000
Overall Width (m) :
1.800
Carriageway Width (m) :
1.800
RS Footpath Width (m) :
0.000
LS Footpath Width (m) :
0.000
Approch Width i/c Shoulders (m) :
2.000
Gradient (%age) :
7
Skew Angle (degree) :
0.00
Radius of Curve in Plan (if Any) :
0.00
Design Data
HFL Highest Flood Level :
1102.500
OFL Ordinary Flood Level :
1100.500
LWL Low Water Level :
1100.000
Design Velocity (m/Sec) :
5.00
Design Discharge (Cumecs) :
1800.00
Soffit Level at Centre :
1104.250
Road Level at Centre :
1105.000
Design Scour Level at Pier :
Design Scour Level at Abutments :
Exposure Condition :
Moderate
Seismic Importance factor :
0.0
Design Loading :
Footpath Live Load
Load Rating :
Footpath Live Load
Super-Structure
Superstructure Type :
Suspension
Superstructure Material :
Steel
Wearing Coat Type :
Other
Expension Joint Type :
Not Provided
Railing/Crash Barrier type :
other
Bearing type :
Not Provided
Sub-Structure
Founding Strata :
Bouldery
Abutment Foundation Type :
Raft
Pier Foundation Type :
NA
No of Piers :
0
Abutment Type :
Stone Masonry
Pier Type :
NA
Protection Work
Bank Protection Left Side of Up-stream :
Plum Concrete Block
Bank Protection Right Side of Up-stream :
Plum Concrete Block
Bank Protection Left Side of Down-stream :
no protection work provided
Bank Protection Right Side of Down-stream :
no protection work provided
Floor Protection on Up-stream :
no protection work provided
Floor Protection on Down-stream :
no protection work provided
Tratment for Corrosion Protection (if any) :
no special treatment provided